My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 2007 PARTIAL TANK TOP UPGRADE & EVR
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
2300 - Underground Storage Tank Program
>
PR0231861
>
INSTALL 2007 PARTIAL TANK TOP UPGRADE & EVR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2019 12:18:21 PM
Creation date
3/7/2019 10:51:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2007 PARTIAL TANK TOP UPGRADE & EVR
RECORD_ID
PR0231861
PE
2361
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
01
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
211
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Dec 05 2007 5 : 31PM CARBONTECH 90g9G43032 p. 3 <br /> SITE PLAN LEGEND & SCOPE OF WORK <br /> THE WORK, IN GENERAL, IS THE INSTALLATION OF NEW DISPENSERS, VAPOR PIPING, VENT PIPING, <br /> HEALY PHAVE II VAPOR EQUIPMENT AND VEEDER ROOT IN STATION DIAGNOSTICS EQUIPMENT AS FOLLOWS: <br /> ITEM DESCRIPTION <br /> PURGE UNDERGROUND PIPING AND REMOVE EXISTING DISPENSERS. <br /> a SAW CUT, DEMO AND REMOVE CONCRETE DRIVE SLAB ON BOTH SIDES OF BOTH ISLANDS. <br /> (SEE SHEET TK1-D) <br /> a SAW CUT, DEMO AND REMOVE EXISTING RAISED CONCRETE ISLANDS. <br /> (SEE SHEET TK1-D) <br /> SAW CUT, DEMO AND REMOVE CONCRETE AT TANK FILLS FOR NEW VENT AND VAPOR PIPING. <br /> (SEE SHEET TK1-D) <br /> EXCAVATE AS NEEDED TO EXPOSE EXISTING PIPING AND ELECTRICAL CONDUITS. <br /> (SE HEET TK1-D) <br /> © EMOVE EXISTING UNDE DISPENSER CONTAINMENT SUMPS (UDC's) - SEE SHT, TK1-D. <br /> REMOVE VAPOR AND PRODUCT PIPE AT ISLANDS - REMOVE 2" VAPOR PIPE TO TANKS. <br /> �7 OBTAIN SOIL SAMPLES AND ANALYZE PER LOCAL AG CY SPECIFI TIONS. <br /> ® POUR NEW RAISED CONCRETE ISLANDS (SEE SHEET TK3-4). <br /> ® INSTALL NEW UDC's (SEE SHEET TK3-3). <br /> INSTALL NEW VENT TRANSITION SUMP (SEE SHEET G.0.6.2 . <br /> 11 MANIFOLD 87 AND 89 PRODUCT PIPES AND INSTALL NEW 3" OVER 2" VAPOR AND PRODUCT PIPING <br /> ALONG ISLANDS. EXTEND TO INSIDE NEW UDC's - INSTALL PENETRATION FITTING SEE SHT. TK3-3). <br /> 1 INSTALL NEW A.O. S FRP VAPOR PIPING - 3" OVER 2" ALONG ISLANDS - 4" OVER TO TA S. <br /> 1 INSTALL NEW 3" OVER 2" A.O. SMITH FRP VENT PIPING. <br /> PROVIDE TESTING AND INSPECTIONS OF PRIMARY AND SECONDARY PIPING. <br /> EXTEND EXISTING ELECTRICAL CONDUITS INTO NEW UDC LOCATIONS (SEE DETAIL D ON SHT. 3 <br /> AND SHEET 5 FOR CONDUIT PLAN). <br /> PROVIDE HYDROSTATIC TESTING AND INSPECTION OF UDC's AND TANK FILL SUMPS. <br /> BACKFILL EXCAVATED AREAS. <br /> POUR MATCHING CONCRETE IN CONSTRUCTION DISTURBED AREAS. <br /> INSTALL NEW WAYNE DISPENSERS WITH HEALY PHASE II EVR AND VEEDER ROOT ISD EQUIPMENT. <br /> INSTALL PER MANUFACTURER'S SPECIFICATIONS. <br /> INSTALL HEALY CLEAN AIR SEPARATOR TANK, MANIFOLD TO EXISTING VENT RISERS. <br /> (SEE SHEET G.0.6.2). <br /> Q INSTALL NEW HOSES, NOZZLES AND BREAKAWAYS (SEE SHEET TK3-4). <br /> UPGRADE EXISTING VEEDER ROOT TLS-350 PANEL WITH NEW SOFTWARE, MODULES AND BOARDS. <br /> 0 (SEE SHEET E2-2). <br /> z3 PROVIDE FUEL SYSTEM TESTING, CALIBRATION, CERTIFICATION AND FINAL INSPECTION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.