Dec 05 2007 5 : 31PM CARBONTECH 90g9G43032 p. 3 <br /> SITE PLAN LEGEND & SCOPE OF WORK <br /> THE WORK, IN GENERAL, IS THE INSTALLATION OF NEW DISPENSERS, VAPOR PIPING, VENT PIPING, <br /> HEALY PHAVE II VAPOR EQUIPMENT AND VEEDER ROOT IN STATION DIAGNOSTICS EQUIPMENT AS FOLLOWS: <br /> ITEM DESCRIPTION <br /> PURGE UNDERGROUND PIPING AND REMOVE EXISTING DISPENSERS. <br /> a SAW CUT, DEMO AND REMOVE CONCRETE DRIVE SLAB ON BOTH SIDES OF BOTH ISLANDS. <br /> (SEE SHEET TK1-D) <br /> a SAW CUT, DEMO AND REMOVE EXISTING RAISED CONCRETE ISLANDS. <br /> (SEE SHEET TK1-D) <br /> SAW CUT, DEMO AND REMOVE CONCRETE AT TANK FILLS FOR NEW VENT AND VAPOR PIPING. <br /> (SEE SHEET TK1-D) <br /> EXCAVATE AS NEEDED TO EXPOSE EXISTING PIPING AND ELECTRICAL CONDUITS. <br /> (SE HEET TK1-D) <br /> © EMOVE EXISTING UNDE DISPENSER CONTAINMENT SUMPS (UDC's) - SEE SHT, TK1-D. <br /> REMOVE VAPOR AND PRODUCT PIPE AT ISLANDS - REMOVE 2" VAPOR PIPE TO TANKS. <br /> �7 OBTAIN SOIL SAMPLES AND ANALYZE PER LOCAL AG CY SPECIFI TIONS. <br /> ® POUR NEW RAISED CONCRETE ISLANDS (SEE SHEET TK3-4). <br /> ® INSTALL NEW UDC's (SEE SHEET TK3-3). <br /> INSTALL NEW VENT TRANSITION SUMP (SEE SHEET G.0.6.2 . <br /> 11 MANIFOLD 87 AND 89 PRODUCT PIPES AND INSTALL NEW 3" OVER 2" VAPOR AND PRODUCT PIPING <br /> ALONG ISLANDS. EXTEND TO INSIDE NEW UDC's - INSTALL PENETRATION FITTING SEE SHT. TK3-3). <br /> 1 INSTALL NEW A.O. S FRP VAPOR PIPING - 3" OVER 2" ALONG ISLANDS - 4" OVER TO TA S. <br /> 1 INSTALL NEW 3" OVER 2" A.O. SMITH FRP VENT PIPING. <br /> PROVIDE TESTING AND INSPECTIONS OF PRIMARY AND SECONDARY PIPING. <br /> EXTEND EXISTING ELECTRICAL CONDUITS INTO NEW UDC LOCATIONS (SEE DETAIL D ON SHT. 3 <br /> AND SHEET 5 FOR CONDUIT PLAN). <br /> PROVIDE HYDROSTATIC TESTING AND INSPECTION OF UDC's AND TANK FILL SUMPS. <br /> BACKFILL EXCAVATED AREAS. <br /> POUR MATCHING CONCRETE IN CONSTRUCTION DISTURBED AREAS. <br /> INSTALL NEW WAYNE DISPENSERS WITH HEALY PHASE II EVR AND VEEDER ROOT ISD EQUIPMENT. <br /> INSTALL PER MANUFACTURER'S SPECIFICATIONS. <br /> INSTALL HEALY CLEAN AIR SEPARATOR TANK, MANIFOLD TO EXISTING VENT RISERS. <br /> (SEE SHEET G.0.6.2). <br /> Q INSTALL NEW HOSES, NOZZLES AND BREAKAWAYS (SEE SHEET TK3-4). <br /> UPGRADE EXISTING VEEDER ROOT TLS-350 PANEL WITH NEW SOFTWARE, MODULES AND BOARDS. <br /> 0 (SEE SHEET E2-2). <br /> z3 PROVIDE FUEL SYSTEM TESTING, CALIBRATION, CERTIFICATION AND FINAL INSPECTION. <br />