Laserfiche WebLink
Note: Enhanced Leak Detection (ELD) must be performed prior to the final inspection. <br />A separate permit application is required to install ELD. <br />2. TO BE SUBMITTED PRIOR TO THE FINAL INSPECTION: <br />❑ Complete to scale As -Built Plans <br />❑ Complete Monitoring and Response Plan <br />❑ UPCF Underground Storage Tanks - Installation Certificate of Compliance (one form <br />per tank) <br />❑ Completed Underground Storage Tank Certification of Financial Responsibility form <br />along with any required attachments <br />❑ Passing Line Leak Detector Test Results <br />❑ Passing Line Tightness Test Results (Required if the UST system does not satisfy the <br />California Code of Regulations 2636(g) for automatic pump shut-off.) <br />❑ Passing Enhanced Leak Detection Results <br />D. INSPECTIONS: <br />Note: A representative from the San Joaquin County Environmental Health Department <br />must witness all activities described below. <br />❑ Tank holiday test (for fiberglass -coated steel tanks) performed prior to installation in <br />excavation <br />❑ Inspection of tank vacuum gauge (if applicable) prior to placement in excavation <br />❑ Tank soap test (for fiberglass tanks) performed prior to installation in excavation <br />❑ Verification of tank set and anchorage in excavation <br />❑ Primary piping including product piping, vapor recovery and vent line piping soap and <br />pressure test <br />❑ Secondary piping including product piping, vapor recovery and vent line piping soap <br />and pressure test <br />❑ 24 -Hour secondary containment lake test on sumps and under -dispenser containment <br />❑ Visual inspection of piping to ensure proper slope prior to covering <br />❑ Overfill performance test <br />❑ Prior to receiving fuel, a complete functional test of tank and piping monitoring <br />system(s) including overfill prevention <br />❑ Final inspection and demonstration of automatic shut down (if applicable). <br />Revised 8/9/06 5 <br />