My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
B
>
BLACK DIAMOND
>
927
>
2800 - Aboveground Petroleum Storage Program
>
PR0515676
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/26/2019 10:42:05 AM
Creation date
3/19/2019 4:18:28 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515676
PE
2832
FACILITY_ID
FA0003775
FACILITY_NAME
TIGER LINES INC
STREET_NUMBER
927
Direction
E
STREET_NAME
BLACK DIAMOND
STREET_TYPE
WAY
City
LODI
Zip
95240
APN
04903033
CURRENT_STATUS
01
SITE_LOCATION
927 E BLACK DIAMOND WAY
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PACIFIC ENVIRONMENTAL SYSTEMS LLC <br /> Periodic Integrity Test Certificate <br /> P.O. Box 576231. Modesto,CA 95357 Telephone: (209) 549-2451/209-499-6692cell <br /> Email: hacificcav(ugrnail.com <br /> Client: Tiger Lines,LLC Contact : Mark Handel,Environmental Compliance Mgr. <br /> Address: 927 Black Diamond Way Phone No.: 800-967-8443 <br /> City/State/Zip; Lodi, CA 95240 Date of Test: 4-25-2019 <br /> Product Stored: Diesel Fuel Tank B <br /> Tank Information(Brand/gallonage/Fuel Stored/UL or other serial#/miscellaneous) <br /> Modern Welding/25000 gals/Diesel FucVUL2085/UL#A702553/Double Wall Steel/22 yrs ohh111995 ) <br /> Description of Secondary Containment Integral Secondary Containment <br /> Date of Test-4-25-2019 Test Supervisor(s) Todd McWhorter <br /> METHOD OF PERIODIC INTEGRITY TEST-Primary XX Secondary XX <br /> I. Steel Thickness Test(in accordance with API-653 and/or STI SP001 (6a edition)-Readings Steel <br /> Thickness UL142 min. .240in./Avg Steel thickness=.332 in. as tested <br /> 2. Inert Gas Blanket <br /> Gas Used: Nitrogens CO2:_ Other(specify) <br /> Air Pressure-Test Vacuum Test XX <br /> Initial Reading (document psi/WC readings) 5Hg Time 8:20am <br /> End Readings (document psi/WC readings) 5Hg Time 9:20am <br /> Duration of Test: %drop <br /> 3. Sonar-Test Y N(document db readings) Duration <br /> 4. Camera(visual) model Lorex MC81845/interstitial (Result: PT)_-_zb�; <br /> 5. Hydro-Carbon Sensor(probe)model OMNTEC BOA- (Result: P/F) <br /> 6. Hydrology (Water Column) (inches of water column readings) <br /> Duration %Drop Results (P/F) <br /> 7. Other: Inspect Vessel &secondary containment. AST clearance is 5 inches above floor. CRDM <br /> present, Tank is Category 1 under STI-SP001 Standards. No evidence of leaking product from <br /> primary vessels stem accessible for inspection: No vroduct in secondary.U on ins ection no evidence <br /> of weld breaks,punctures,cracks,or other structural damage to the tank. No external issues affecting tank <br /> iute rit . AST is anchored to concrete floor. : PASS <br /> TEST RESULTS <br /> 150-Stage: <br /> Pass XX Fail_(quantify) SENSOR DETECTS NO PRODUCT ,NOR LEAKS FROM PRIMARY <br /> TANK INTO SECONDARY CONTAINMENT <br /> 2id-Stage: <br /> Pass XX Fail (quantify) NO VISUAL EVIDENCE OF PRODUCT IN THE SECONDARY <br /> NOR OF ANY OTHER LEAKS & STEEL THICKNESS IN EXCESS OF MINIMUM UNDER UL <br /> 142 STANDARD & NO DECAY ON VACUUM LEVELS FOR VACUUM TEST FOR 1 ITR. <br /> Comments section data on file <br /> Next Scheduled Periodic Integrity Test 4-25-2039 4-25--2039 <br /> Q yyn"- Pacific Environmental Systems,Representative <br /> STI SP001 Certified Inspector No.: AST 135013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.