My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VAL DERVIN
>
107
>
2200 - Hazardous Waste Program
>
PR0505919
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2024 12:58:01 PM
Creation date
3/20/2019 10:35:24 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0505919
PE
2220
FACILITY_ID
FA0007083
FACILITY_NAME
B & C PAINTING SOLUTIONS INC
STREET_NUMBER
107
STREET_NAME
VAL DERVIN
STREET_TYPE
PKWY
City
STOCKTON
Zip
95206
APN
19337005
CURRENT_STATUS
01
SITE_LOCATION
107 VAL DERVIN PKWY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2220_PR0505919_107 VAL DERVIN_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
514
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1534 Willow Pass Road,Pittsburg,CA 94565-1701 <br /> f� M c C a m Q b e I l Analytical, Inc. Toll Free Telephone:(877)252-9262/Fax:(925)252-9269 <br /> <! "When Quality Counts" http://www.mccainpbell.com/E-mail:main@mccampbell.com <br /> WORK ORDER SUMMARY <br /> Client Name: FREMOUW ENVIRONMENTAL SERVICES,INC. QC Level: LEVEL 2 Work Order: 1509A59 <br /> Project: 62965;B&C Painting Client Contact: Dina Barron Date Received: 9/25/2015 <br /> Comments: email Dina Barron(Not Simone!!!)if samples are not in Contact's Email: dbarron@hazwasteremoval.com; Date Add-On: 9/30/2015 <br /> appropriate containers!9/2/14 Blake. STLC Ba,Cr added per pfremouw@hazwasteremoval.com; <br /> ll/ .1-(STAT <br /> Lab ID Client ID Matrix Test Name Containers Bottle&Preservative Collection Date TAT Sediment Hold SubOut <br /> /Composites &Time Content <br /> 1509A59-001A BC-001 Soil SW6020(Metals)(STLC) <Barium, 2 Stainless Steel tube 2"x6" 9/25/2015 10:30 5 days* <br /> Chromium> <br /> i .. <br /> g' <br /> 4 <br /> t <br /> NOTES: -STLC and TCLP extractions require 2 days to complete; therefore, all TATs begin after the extraction is completed (i.e., One-day TAT yields results <br /> in 3 days from sample submission). <br /> -MAI assumes that all material present in the provided sampling container is considered part of the sample-MAI does not exclude any material from <br /> the sample prior to sample preparation unless requested in writing by the client. <br /> Page 1 of 1 <br /> Page 6 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.