Laserfiche WebLink
Ver. 1-L-doc-3-18-10 <br /> . Inspections, Testing04c)(6) <br /> rdeei and Personnel Trinin 11 .7(and (f), 112.8(c)(6) and <br /> ,( )(4), 11 . (c)( ), 11and ( )(4)): <br /> spil °'' r>I' nne( ruin' <br /> _,. s. <br /> "An ins0ection and/or testing program is implemented for all aboveground bulk storage containers and piping at <br /> this faciii [0112.8(c)(6)and M(4, 112.9(c)(3), 112.12(c)(6) and(d)(4)] <br /> The following is a description of the inspection and/or testing program (e.g. reference to industry standard utilized, <br /> scope, frequency, method of inspection or test, and person conducting the inspection)for all aboveground bulk storage <br /> containers and piping at this facility: 45 <br /> M1 y r l <br /> N-1-1 00 M11 <br /> Inspections, tests, and records are conducted in accordance with written procedures developed for the facility. <br /> Records of inspections and tests kept under usual and customary business practices will suffice for purposes of <br /> this ara ra h. 112.7 e <br /> A record of the inspections and tests are kept at the facility or with the SPCC Plan for a period of three years. <br /> 112.7e See Inspection Log and Schedule in Attachment 3.1 <br /> Inspections and tests are signed by the appropriate supervisor or inspector.[ 112.7(e)] <br /> Personnel,training,and discharge Prevention roce urM1121MI <br /> Oil-handling personnel are trained in the operation and maintenance of equipment to prevent discharges; <br /> discharge procedure protocols; applicable pollution control laws, rules, and regulations;general facility <br /> operations; and, the contents of the facili SPCC Plan. 112.7 <br /> A person who reports to facility management is designated and accountable for discharge prevention. <br /> f§1127(0] <br /> Name/Title• m <br /> Discharge prevention briefings are conducted for ' -9 personnel annually to assure adequate <br /> understanding of the SPCC Plan for that facility. Such briefings highlight and describe past reportable <br /> discharges or failures, malfunctioning components, and any recently developed precautionary measures. <br /> I§112.7(o] <br /> See 011-handling Personnel Training and riefin Log in Attachment 3.4 <br /> Facility Name: . / , ` page 5 Tier I Qualified Facility SPCC Plan <br />