Laserfiche WebLink
_ Ver_1-L-doc-3-18-10 <br /> All aboveground valves and pip associated with transfer operations are inMUcted periodically and <br /> El <br /> upon s regular schedule. The general condition of flange joints, valve glands and bodies,drip pans,pipe <br /> supports, pumping well polish rod stuffing boxes, bleeder and gauge valves, and other such items are <br /> included in the inspection. See Inspection Log and Schedule in Attachment 3.1 112.9 d 1 <br /> An oil spill contingency plan and written commitment of resources are provided for flowlines and intraFi <br /> - <br /> facility gathering lines[See Oil Spill Contingency Plan and Checklist in Attachment 2 and Inspection <br /> Log and Schedule in Attachment 3.11 j§112.9(d)(3)J <br /> or <br /> Appropriate secondary containment and/or diversionary structures or equipment is provided for flowlines ❑ ] <br /> and intra-facility gathering lines to prevent a discharge to navigable waters or adjoining shorelines.The <br /> entire secondary containment system, including walls and floor, is capable of containing oil and is <br /> constructed so that any discharge from the pipe,will not escape the containment system before cleanup <br /> occurs. <br /> A flowline/intra-facility gathering line maintenance program to prevent discharges from each flowline has <br /> been established at this facility. The maintenance program addresses each of the following: ® �- <br /> Flowlines and intra-facility gathering lines and associated valves and equipment are compatible <br /> with the type of production fluids, their potential corrosivity, volume, and pressure, and other ® J <br /> conditions expected in the operational environment; =' <br /> ® Flowlines, intra-facility gathering lines and associated appurtenances are visually inspected <br /> and/or tested on a periodic and regular schedule for leaks,oil discharges, corrosion, or other <br /> conditions that could lead to a discharge as described in§112.1(b).The frequency and type of <br /> testing allows for the implementation of a contingency plan as described under part 109 of this <br /> chapter. <br /> Corrective action and repairs to any flowlines and intra-facility gathering lines and associated <br /> appurtenances as indicated by regularly scheduled visual inspections,tests, or evidence of a <br /> discharge. _ <br /> Accumulations of oil discharges associated with flowlines, intra facility gathering lines, and <br /> associated appurtenances are promptly removed. 112.9 d j <br /> The following is a description of the flowline/intra-facility gathering line maintenance program implemented at this <br /> facility: <br /> n ... o <br /> C. Onshore.Oil Drilling and Wockover Facilities(§1'i210(b),(c)and(d)j: <br /> The owner or operator must meet the general rule requirements as well as the requirements under this section. <br /> %Table 2 General.Rule" vire eats'fox;Ornshore Oil Dril1'n and. ork®veir facilities <br /> Mobile drilling or worker equipment is positioned or located to prevent discharge as described in §112.1(b). <br /> 112.1D b <br /> Catchment basins or diversion structures are provided to intercept and contain discharges of fuel, crude oil, or <br /> oily drilling fluids. 112.10 c <br /> A blowout prevention (BOP)assembly and well control system was installed before drilling below any casing <br /> strip or durin workover o rations. 112.10 d <br /> The BOP assembly and well control syst m is able of controlling any well-head pressure that may be <br /> encountered while the BOP assemblyell controls stem are on the well. 112.10 d <br /> Facility Name: (``� ,f . / Page 12 Tier i Qualified Facility SPCC Plan <br />