My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
401
>
2300 - Underground Storage Tank Program
>
PR0231346
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 10:36:02 AM
Creation date
3/20/2019 11:10:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231346
PE
2361
FACILITY_ID
FA0003603
FACILITY_NAME
TESORO (SPEEDWAY XP) 68152
STREET_NUMBER
401
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04513019
CURRENT_STATUS
01
SITE_LOCATION
401 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recommended Practices for the Testing and Verification of Spill, Overfill, Leak Detection and Secondary Containment Equipment at UST Facilities <br />4. Reset the E-stop that was just tested. • all dispensing devices on all islands; <br />S. Ensure that power has been reestablished to normal • all submersible pumps for all fuel grades that serve <br />operating condition. dispensing devices; <br />6. Continue to test each )-stop switch at the entire facil- • all power, control and signal circuits associated with <br />ity. the dispensing devices and the submersible pumps; <br />7. Once every E-stop switch has been tested for proper • all other non-intrinsically safe electrical equipment <br />operation, ensure that power has been reestablished to in the classified areas surrounding fuel dispensing <br />the entire facility and allow normal pumping opera- devices. <br />tions to resume. <br />If any one of the passing criteria noted above is not met, <br />11.7 Pass/Fall Criteria. If all )-stop switches/buttons then the E-stop switches/buttons fail the test. <br />disconnect power to the following, the system passes the <br />test: <br />pei.org 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.