Laserfiche WebLink
M PEI/RP1200-17 <br />ELECTRONICMECHANICAL AND O- <br />PERFORMANCE TESTS <br />Facility Name: Owner: <br />Address: Address: <br />City, State, Zip Code: City, State, Zip Code: <br />Facility I.D. #: Phone #: <br />Testing Company: Phone #: Date: <br />This data sheet can be used to test mechanical line leak detectors (MLLD) and electronic line leak detectors (ELLD) with submersible <br />turbine pump (STP) systems. See PEI/RP1200 Sections 9.1 and 9.2 for test procedures. <br />Line Number <br />Product Stored <br />Leak Detector Manufacturer <br />Leak Detector Model <br />Type of Leak Detector ❑ MLLD ❑ MLLD ❑ MLLD ❑ MLLD ❑ MLLD ❑ MLLD <br />❑ ELLD ❑ ELLD ❑ ELLD ❑ ELLD ❑ ELLD ❑ ELLD <br />MLLD (ALL PRESSURE MEASUREMENTS ARE MADE IN PSIG) <br />STP Full Operating Pressure <br />Check Valve Holding Pressure <br />Line Resiliency (ml) (line bleed back vol- <br />ume as measured from check valve hold - <br />Ing pressure to 0 psig) <br />Step Through Time in Seconds (time the <br />MLLD hesitates at metering pressure <br />before going to full operating pressure <br />as measured from 0 psig with no leak <br />induced on the line) <br />Metering Pressure (STP pressure when <br />simulated leak rate 3 gph at 10 psig) <br />Opening Time in Seconds (the time the <br />MLLD opens to allow full pressure after <br />simulated leak is stopped) <br />Does the STP pressure remain at or <br />below the metering pressure for at least <br />❑ Yes ❑ No <br />❑ Yes ❑ No <br />❑ Yes ❑ No <br />❑ Yes ❑ No <br />❑ Yes ❑ No <br />❑ Yes ❑ No <br />60 seconds when the simulated leak is <br />induced? <br />Does the leak detector reset (trip) when <br />❑Yes ❑ No <br />El Yes 11 No <br />1:1 Yes E) No <br />El Yes 11 No <br />1:1 Yes ❑ No <br />El Yes 1:1 No <br />the line pressure is bled off to zero psig? <br />Does the STP properly cycle on/off under <br />❑ Yes ❑ No <br />❑ Yes 1:1No <br />❑ Yes ElNo <br />❑ Yes [DNo <br />11Yes 11No <br />❑ Yes ❑ No <br />normal fuel system operation conditions? <br />A "No" answer to either of the above questions indicates the MLLD falls the test. <br />ELLD (ALL PRESSURE MEASUREMENTS ARE MADE IN PSIG) <br />STP Full Operating Pressure <br />How many test cycles are observed <br />before alarm/shutdown occurs? <br />Does the simulated leak cause an alarm? <br />❑ Yes ❑ No <br />❑ Yes ❑ No <br />❑ Yes ❑ No <br />❑ Yes ❑ No <br />❑ Yes ❑ No <br />❑ Yes ❑ No <br />A "No" answer to the above question indi- <br />cates the ELLD falls the test. <br />Does the simulated leak cause an STP <br />❑ Yes ❑ No <br />[]Yes ❑ No <br />❑ Yes ❑ No <br />❑ Yes ❑ No <br />❑ Yes ❑ No <br />❑ Yes ❑ No <br />shutdown? <br />❑ NA <br />❑ NA <br />[INA <br />❑ NA <br />LINA <br />❑NA <br />Test Results <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comments: <br />Tester's Name (print) Tester's Signature <br />0 pei.org <br />