My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
401
>
2300 - Underground Storage Tank Program
>
PR0231346
>
COMPLIANCE INFO_2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2022 10:36:02 AM
Creation date
3/20/2019 11:10:11 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2019
RECORD_ID
PR0231346
PE
2361
FACILITY_ID
FA0003603
FACILITY_NAME
TESORO (SPEEDWAY XP) 68152
STREET_NUMBER
401
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04513019
CURRENT_STATUS
01
SITE_LOCATION
401 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
140
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address : 401 W . Kettleman Ln . , Lodi <br /> . IS. $ : 2 Piping Runs are estimated only. <br /> .Float & . Float & <br /> .Chains • Chains • <br /> Float & Float & <br /> Chains : Chain 's <br /> 1. 3 . <br /> TLSO. RegulUr Prem. . . <br /> STP STP <br /> . . . 208 . •208 <br /> • LD2000 LD2000 , <br /> . ESO• <br /> :(D. ATG ATG <br /> . . � <br /> 0OF <br /> 46, <br /> Date map was drawn: 02/21 /2019 <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it, rather than this page, with your <br /> Monitoring System Certification. On your site plan, show the general layout of tanks and piping. Clearly identify <br /> locations of the following equipment, if installed : monitoring system control panels ; sensors monitoring tank annular <br /> spaces, sumps , dispenser pans, spill containers, or other secondary containment areas ; mechanical or electronic line leak <br /> detectors ; and m4ank liquid level probes (if used for leak detection) . In the space provided, note the date this Site Plan <br /> was prepared . Page l of 1 os/oo <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.