Laserfiche WebLink
UNDERGROUND STORAGE TANK <br />SECONDARY CONTAINMENT TESTING REPORT FORM (Page 1 of 6) <br />Type of Action ❑ Installation Test <br />❑ Repair Test ❑ Six Month Test 0 36 Month Test <br />I. FACILITY INFORMATION <br />CERS ID <br />10181231 <br />Date of Secondary Containment Test <br />112/12/2019 <br />Business Name (Same as Facility Name or DBA-Doing Business As) <br />Speedway #68152 <br />Business Site Address <br />401 W. Kettleman Ln. <br />City <br />Lodi <br />ZIP Code <br />95240 <br />II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br />Name of UST Service Technician Performing the Test (Print as shown on the ICC Certification) <br />Michael McCarter <br />Phone # <br />(707) 545-5522 <br />Contractor / Tank Tester License # <br />Able Maintenance, Inc. - 312844 <br />ICC Certification # <br />8819839 <br />ICC Certification Expiration Date <br />10/15/2021 <br />III. SUMMARY OF SECONDARY CONTAINMENT TESTING RESULTS <br />TANK ID: (By tank number, stored product, etc.) <br />A 87 B 91 <br />C <br />D <br />Tank Containment <br />Tightness Test Result <br />0 Pass ❑ Fail ❑ NA 0 Pass ❑ Fail ❑ NA <br />❑ Pass ❑ Fail ❑ NA <br />❑ Pass ❑ Fail ❑ NA <br />Product Piping Containment <br />Tightness Test Result <br />0 Pass ❑ Fail ❑ NA 0 Pass ❑ Fail ❑ NA <br />❑ Pass ❑ Fail ❑ NA <br />❑ Pass ❑ Fail ❑ NA <br />Communication Test Result <br />0 Pass ❑ Fail ❑ NA 0 Pass ❑ Fail ❑ NA <br />❑ Pass ❑ Fail ❑ NA <br />❑ Pass ❑ Fail ❑ NA <br />Remote Fill Piping Containment <br />Tightness Test Result <br />❑ Pass ❑ Fail 0 NA ❑ Pass ❑ Fail 0 NA <br />❑ Pass ❑ Fail ❑ NA <br />❑ Pass ❑ Fail ❑ NA <br />Communication Test Result <br />❑ Pass ❑ Fail 0 NA ❑ Pass ❑ Fail 0 NA <br />❑ Pass ❑ Fail ❑ NA <br />❑ Pass ❑ Fail ❑ NA <br />Vent Piping Containment <br />Tightness Test Result <br />❑ Pass ❑ Fail 0 NA ❑ Pass ❑ Fail 0 NA <br />❑ Pass ❑ Fail ❑ NA <br />❑ Pass ❑ Fail ❑ NA <br />Communication Test Result <br />❑ Pass ❑ Fail 0 NA ❑ Pass ❑ Fail 0 NA <br />❑ Pass ❑ Fail ❑ NA <br />❑ Pass ❑ Fail ❑ NA <br />Vapor Recovery Piping Containment <br />Tightness Test Result <br />❑ Pass ❑ Fail 0 NA ❑ Pass ❑ Fail 0 NA <br />❑ Pass ❑ Fail ❑ NA <br />❑ Pass ❑ Fail ❑ NA <br />Communication Test Result <br />❑ Pass ❑ Fail 0 NA ❑ Pass ❑ Fail 0 NA <br />❑ Pass Cl Fail ❑ NA <br />❑ Pass ❑ Fail ❑ NA <br />Turbine / Product Piping Sump <br />Tightness Test Result <br />0 Pass ❑ Fail ❑ NA 0 Pass ❑ Fail ❑ NA <br />❑ Pass ❑ Fail ❑ NA <br />❑ Pass ❑ Fail ❑ NA <br />Fill Riser Sump <br />Tightness Test Result <br />VENT / TRANSITION SUMP ID: <br />❑ Pass ❑ Fail 0 NA ❑ Pass ❑ Fail 0 NA <br />a b <br />❑ Pass ❑ Fail ❑ NA <br />C <br />❑ Pass ❑ Fail ❑ NA <br />d <br />Tightness Test Result <br />❑ Pass ❑ Fail 0 NA ❑ Pass ❑ Fail 0 NA <br />❑ Pass ❑ Fail ❑ NA <br />❑ Pass ❑ Fail ❑ NA <br />UDC ID: <br />11/2 23/4 <br />35/6 <br />47/8 <br />Tightness Test Result <br />0 Pass ❑ Fail ❑ NA 0 Pass ❑ Fail ❑ NA <br />0 Pass ❑ Fail ❑ NA <br />0 Pass ❑ Fail ❑ NA <br />UDC ID: <br />5 6 <br />7 <br />8 <br />Tightness Test Result <br />❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br />❑ Pass ❑ Fail ❑ NA <br />❑ Pass ❑ Fail ❑ NA <br />UDC ID: <br />9 10 <br />111 <br />12 <br />Tightness Test Result <br />❑ Pass ❑ Fail ❑ NA ❑ Pass ❑ Fail ❑ NA <br />❑ Pass ❑ Fail ❑ NA <br />❑ Pass ❑ Fail ❑ NA <br />All items marked "Fail" or "NA" must be explained in their respective "COMMENTS" section. <br />IV. CERTIFICATION <br />BY UST SERVICE TECHNICIAN CON <br />G_,Ti4S:,TESTINC..-. x: <br />I hereby certify that the secondary containment was tested in accordance with Calif ,d <br />3, Chapter 16, Section 2637 and all the information contained herein is accurate. <br />ededof Rdgufaoogs; a 2,, , D ision <br />UST Service Technician Signature <br />_. <br />CERS = California Environmental Reporting System, ID = Identification, UST = Underground Storage Tank, ICC = International Code Canal, NA = Not Applicable, UDC = Under - <br />Dispenser Containment ENVIRONMENTAL HEALTH <br />DEPARTMENT <br />