My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 2:53:50 PM
Creation date
3/20/2019 11:50:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTACT US FOR MORE INFORMATION ! <br /> 1555 Copperhill Parkway / Santa Rosa , CA 95403 <br /> stern Ph : ( 800 ) 688-3375 or ( 707 ) 523-2050 <br /> erslao www.westernfg . com <br /> _ 1 <br /> i <br /> s � - <br /> - FEE 2 20 j3 <br /> Prepare coupling fitting and attach Co - Flex termination fitting ( male or <br /> female ) to connector within sump area /s . Tighten . <br /> Position pipe within trench . Lay out piping runs while maintaining <br /> separation between pipe lengths and at crossover points . <br /> TEST & CROSSOVER BOOT/TUBING INSTALLATION . <br /> The Test / Crossover Assembly Boots are attached to the Co - Flex Piping <br /> ends to provide a sealed access and test point for the <br /> interstitial /secondary space within the pipe . The Test / Crossover Boots <br /> utilizes two ( 2 ) # 28 stainless steel hose clamps which when tightened <br /> around the termination fitting swage sleeve and the Co - Flex outer jacket <br /> isolate the interstitial space . An air valve stem is installed in the boot on <br /> the bottom for an outlet opening for connecting the crossover and / or test <br /> tubes . These tubes are used for the testing of and the interconnection of <br /> the interstitial space from pipe section to pipe section . Crossover tube <br /> assemblies are used for junctions within dispenser sumps , pipe to pipe in <br /> line connections , piping run termination points , tank sump connection <br /> points and any piping manifold connection points . <br /> Test / Crossover Boots and tubes are fitted and tightened in place after the <br /> piping terminations and their connections have been made . <br /> After installation and tightening of all test and crossover boots and tubes <br /> pressure testing may be done . ( See Above ) . <br /> COPYRIGHT 2006 BY WESTERN FIBERGLASS , INC . <br /> ALL RIGHTS RESERVED , USE BY WRITTEN PERMISSION ONLY , Page 11 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.