My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PACIFIC
>
6425
>
2300 - Underground Storage Tank Program
>
PR0231211
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 2:53:50 PM
Creation date
3/20/2019 11:50:38 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0231211
PE
2371
FACILITY_ID
FA0002409
FACILITY_NAME
SAFEWAY FUEL CENTER #2707
STREET_NUMBER
6425
Direction
N
STREET_NAME
PACIFIC
STREET_TYPE
AVE
City
STOCKTON
Zip
95207
CURRENT_STATUS
01
SITE_LOCATION
6425 N PACIFIC AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STEP8 (COMPLETE ❑ <br /> BEAD EPDXY <br /> HEAVILY ON ALL SEAMS <br /> �Q <br /> 3600 DEGREES AROUND <br /> FITTING BEFORE <br /> CLEANUP <br /> Q <br /> c <br /> PIPE CLAMP <br /> SEAL YOUR FITTING <br /> BODY TOGETHER. <br /> n � P <br /> Stick this assembly to the wall and apply a strong pressure to push the halves <br /> together and against the wall. Epoxy should ooze from every seam and joint. Clean the <br /> face of the fitting with acetone or equivalent and remove excess epoxy. You want the fit- <br /> ting clean enough to remove the pipe clamp after the fitting cures. <br /> Use provided pipe clamp to secure the fitting halves to each other. More epoxy may <br /> ooze from the split seams as you tighten, re-clean as necessary. <br /> LET THE FITTING CURE DO NOT ALLOW THE PIPE OR <br /> CONDUITS TO MOVE OR TWIST DURING THE CURE STAGE <br /> After a full cure, remove the pipe clamp holding the two fitting halves together. If it is <br /> too difficult to remove and appears to be bonded in place, do not force it off. <br /> STEP 9 Water Testing: COMPLETE ❑ <br /> After the F-Series Retrofit-S Fittings are installed and have fully cured, water level test to a <br /> minimum of 2" above the highest penetration fitting on the sump. Follow local regulations. <br /> If this Retrofit was installed to steel sumps: <br /> Re-coat and corrosion-protect any exposed steel around the fitting area. <br /> 13 ii-F-Series-Retrofit-S-15A <br />
The URL can be used to link to this page
Your browser does not support the video tag.