Laserfiche WebLink
r<= \� CG RS UST Spill Bucket <br /> SOLUTIONS DELIVERED • <br /> Integrity Testing Form <br /> Underground Storage Tanks ( UST) Program <br /> Instructions on Page 3 <br /> Purpose : This procedure is to test the leak integrity of single - and double-walled spill buckets . See reverse side for <br /> basic hydrostatic testing instructions . Consult PEIIRP1200, Section 6 . 2 for hydrostatic test method , Section 6. 3 for <br /> single -walled vacuum test method , and Section 6 .4 for double -walled vacuum test method . <br /> Testing Information <br /> 1 . Tank number 87 89 91 <br /> 2. Product stored Unleaded Unleaded Unleaded <br /> 3. Spill bucket capacity Under 5 gallons 5 gallons Under 5 gallons <br /> 4. Manufacturer OPW OPW OPW <br /> 9 Single-walled N Single -walled 9 Single-walled ❑ Single -walled ❑ Single-walled ❑ Single-walled <br /> 5. Construction ❑ Double-walled ❑ Double-walled ❑ Double-walled ❑ Double-walled ❑ Double-walled ❑ Double-walled <br /> ❑ Hydrostatic ❑ Hydrostatic 9 Hydrostatic ❑ Hydrostatic ❑ Hydrostatic ❑ Hydrostatic <br /> ❑ Vacuum ❑ Vacuum ❑ Vacuum ❑ Vacuum ❑ Vacuum ❑ Vacuum <br /> ❑ Single-walled ❑ Single-walled ❑ Single-walled ❑ Single-walled ❑ Single -walled ❑ Single-walled <br /> 6. Testt pe ❑ Double-walled ❑ Double-walled ❑ Double-walled ❑ Double-walled ❑ Double-walled ❑ Double-walled <br /> N Product NJ Product i] Product ❑ Product ❑ Product ❑ Product <br /> 7. Spill bucket type ❑ Vapor ❑ Vapor ❑ Vapor ❑ Vapor ❑ Vapor ❑ Vapor <br /> 8 . Liquid and debris <br /> removed from spill <br /> bucket: * [!] Yes ElNo 0 Yes El No ff Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No <br /> i <br /> 9. Visual inspection <br /> (No cracks , loose parts or <br /> separation of the bucket <br /> from the fill i e.)? R Pass ❑ Fail ❑ Pass X Fail 0 Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> 10. Tank riser cap included in <br /> test? [9 Yes ❑ No ❑ NA © Yes ❑ No ❑ NA 3 Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> 11 . Is drain valve included in <br /> test? E Yes ❑ No ❑ NA i] Yes ❑ No ❑ NA O Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA <br /> 12. Starting level NA NA NA <br /> 13. Test start time NA NA NA <br /> 14. Ending level NA NA NA <br /> 15. Test end time NA NA NA <br /> 16. Test period NA NA NA <br /> 17. Level chap e NA NA NA <br /> Test results : ❑ Pass ❑ Fail ❑ Pass 9 Fail ❑ Pass 9 Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail ❑ Pass ❑ Fail <br /> Pass/fail criteria: Must pass visual inspection. Hydrostatic : Water level drop of less than 1/8 inch; Vacuum single-walled only; <br /> Maintain at least 26 inches water column; Vacuum double-walled; maintain at least 12 inches water column. <br /> Comments : <br /> * All liquids and debris must be disposed of properly. <br /> Testing company CGRS Garrett Warren <br /> name : W7 °«,vE" Tester's name : <br /> Date : 3-25-2019 Tester's signature : <br /> GPH = Gallons per hour, Y = Yes, N = No, NA = Not applicable, VPH = Vacuum/PressurelHydrostatic, ID = Identification <br />