My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING 2008 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
130
>
2300 - Underground Storage Tank Program
>
PR0231861
>
BILLING 2008 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2023 4:12:45 PM
Creation date
3/20/2019 3:49:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2008 - 2015
RECORD_ID
PR0231861
PE
2361
FACILITY_ID
FA0003601
FACILITY_NAME
ARCO STATION #826951*
STREET_NUMBER
130
Direction
S
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205-5561
APN
15502064
CURRENT_STATUS
01
SITE_LOCATION
130 S WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Page I of 2) <br /> TYPE OF ACTION ❑ 1.NEW PLAN 2.CHANGE OF INFORMATION 1 <br /> PLAN TYPE 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. )0'2 <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S)- <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) I I I - I I I 1 -1 1 1 1 1 1 11 <br /> BUSINESS NAME(Same as FACILITY NAME) ILLO STArr WM 4& SVPqS; 3. <br /> BUSINESS SITE ADDRESS ` `LOL W AIf 103' CITY 104. <br /> 11.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring.equipment(e.g.,sensors,probes,line leak detectors,etc.)must!?e performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be perfo`rined by qualified personnel. <br /> 23 CCR§2632,2634,2638,2641 <br /> 4%-3a <br /> MONITORING EQUIPMENT IS SERVICED Dff 1.ANNUALLY ❑ 99.OTHER(Specify): 49.36 <br /> 1I1.MONITORING LOCATIONS <br /> ❑1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. ja 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)4,)1" <br /> IV.TANK MONITORINGIS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT 41N1-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑d.UNDER VACUUM 49,K <br /> PANEL MANUFACTURER: ""Pm- o[ 490-7. MODEL S'O 49)'8 <br /> LEAK SENSOR MANUFACTURER: fy_ 490-9. 1MODEL#(S): 7 4% LfStO - 3Z 490-10 <br /> ❑ 2.AUTOMATIC TANK GAUGINV(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: \ 49(1-12. MODEL#: 41A)-13 <br /> IN-TANK PROBE MANUFACTURER: _ 490.14. MODEL#(S): 490.15 <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAFLY/NIGHTLY ❑ c.WEEKLY 4x)-16 <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 41x)-17 <br /> PROGRAMMED TESTS: C] a.0.1 g.p.h. [Ib.0.2 g.p.h. ❑ c.OTHER(Specify): 490•19 <br /> 4'x>-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 4'x''20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: Ela.36 HOURS El b.60 HOURS 4)-11 <br /> 49.22 <br /> ❑ 5.TANK INTEGRITY TESTING(23 CCR§2643.1): . 490.23 <br /> TEST FREQUENCY: ❑ a.ANNUALLY 4''°'24 <br /> Q ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490-25 <br /> ❑99.OTHER (Specify): 490.26 <br /> 490.27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) <br /> 1.CONTINUOUS MONITORING OF PIPE/PH'ING SUMPS)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 41x)-28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> SECONDARY CONTAINMENT IS:Ka.DRY ❑b.LIQUID FILLED ❑c.PRESSURIZED ❑d.UNDER VACUUM 4%)-29 <br /> PANEL MANUFACTURER: 1 IE2!112____¢-W'T_ __ 49.3° MODEL#: Lt, 1,5C) 4`X)-31 <br /> 490 32 <br /> LEAK SENSOR MANUFACTURER: VG GD0'R .LOO'` MODEL#(S):'moi j Q. -323 41M.33 <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. LV a.YES ❑b.NO 490-34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. tga.YES ❑b.NO 41X)-35 <br /> ❑ 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED 23 CCR 2636 _ _ 490-36 <br /> MLLD MANUFACTURER(S): 490-37 MODEL#(S): 4x)-38 <br /> ® 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 49._39 <br /> ELLD MANUFACTURER(S) %f t?'2 KL RooT '(l lg y1,I( i t O Sg�L _ MODEL#(S): Pc.�.Q g1'f�1C� � <br /> PROGRAMMED IN LINE LEAK TEST: ❑ 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. 4%41- <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES ❑b.NO 4x)")3 <br /> ELLD FAILURE/DISC6NNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ®a.YES ❑b.NO 49044 <br /> ❑ 4.PIPE INTEGRITY TESTING 4x)45 <br /> TEST FREQUENCY ❑ a.ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 4x)..25,49("7 <br /> ❑ 5.VISUAL PIPE MONITORING. 4%).48 <br /> FREQUENCY ❑ a.DAILY ❑ b.WEEKLY ❑C.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 4•x49 <br /> •.Ulmed for m iioring of unburied ewer m generator fuelpiping- onlc HSC 2528.5(6X3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA 123 CCR§2636(a)(3)1. 490-50 <br /> ❑ 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 4 x)-51 <br /> 4x)-52 <br /> 99.OTHER(Specify) 49.53 <br /> UPCF UST-D(12/2007)1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.