Laserfiche WebLink
IAL A&L <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - PAGE 2 <br /> VI. DISPENSER MONITORING <br /> MONITORING OF AREAS BENEATH DISPENSER(S)IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) Myo. <br /> ® 1.CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT(UDC) <br /> PANEL MANUFACTURER: Veeder Root M51. MODEL#: TLS 350 M52. <br /> LEAK SENSOR MANUFACTURER: Veeder Root MSs. MODEL#(S): 794380-323 M54. <br /> WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? ® a.YES ❑ b.NO M55. <br /> WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? ® a.YES ❑ b.NO M56. <br /> WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ® a.YES ❑ b.NO MIT <br /> ❑ 2.MECHANICAL ASSEMBLY(e.g.,FLOAT AND CHAIN ASSEMBLY)IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br /> ASSEMBLY MANUFACTURER: M58. MODEL#(S): M59. <br /> ❑ 3.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Requires agency approval) M60 <br /> ❑ 4.NO DISPENSERS <br /> ❑ 99.OTHER(Specify)' M61. <br /> VII. ENHANCED LEAK DETECTION <br /> ❑ 1.WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK M70. <br /> DETECTION(ELD)FOR THE UST(S)COVERED BY THIS PLAN.PER 23 CCR§2644.1,ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED— <br /> VIII. TRAINING <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) Meo. <br /> 1. ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) <br /> 2. ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)* <br /> 3. ® THE FACILITY'S BEST MANAGEMENT PRACTICES(Required as of MM/DD/YY) <br /> 4. ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> 5. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> 6. [1 STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> 7. ❑ SWRCB PUBLICATION:"WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br /> Mel, <br /> oma-r] OTHER(Specify): <br /> ,nnel with UST monitoring responsibilities are familiar with all of the above documents relevant to their job duties and can access those documents when needed. <br /> By 1/1/2005,this facility will have a"Designated UST Operator"who has passed the operator exam administered by the International Code Council(ICC). By July 1, <br /> 2005,and annually thereafter,the "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems.This training <br /> will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the leak detection equipment. <br /> ➢ The facility employee's role with regard to spills and overfills. <br /> ➢ Whom to contact for emergencies and leak detection alarms. <br /> For facility employees hired on or after July 1,2005,the initial training will be conducted within 30 days of the date of hire. <br /> IX. COMMENTSAADDITIONAL INFORMATION <br /> Please use this sect on to include any additional UST system monitoring-related information(e.g.,additional information required by your local agency): Me5 <br /> X prf"tt.t- lWA%*Nttart = AMotel v►sugi 14J_* ,eV,% , 0-'0A,- rL4U1 , tct,v 5 ry" 1' <br /> *Monitoring systems manual maintained by contracted, licensed pump and tank technicians. <br /> Best Management Practices are maintained in the H.S.S.E. Retail Facility Programs Manual(Green Binder). <br /> **ELD Test Reports submitted to the San Joaquin Environmental Health Division: Report date 12/10/04 <br /> X. PERSONNEL RESPONSIBILITIES <br /> THE FACILITY OPERATOR DESIGNATED IN SECTION XI BELOW IS RESPONSIBLE FOR PEFORMING MONITORING. BP WEST COAST PRODUCTS <br /> LLC IS RESPONSIBLE FOR MAINTAINING AND TESTING ALL MONITORING EQUIPMENT. <br /> XI. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION: I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> OWNER/0 ERATOR SIGN REPRESENTING DATE: M91. <br /> i ❑Owner M9o. <br /> � ®Operator 2 3 M N*12• O <br /> OWNER/OPERATOR NAME(print): M92. OWNER/OPERATOR TITLE: M99 <br /> LAWRENCE WIGHT DEALER <br /> icy Use Only) This plan has been reviewed and: Approved ❑Approved With Conditions ❑Disapproved <br /> Local Agency Signature: Date: J <br /> Comments/Special Conditions: <br /> II <br /> Arco#05469,Belshire Environmental Services Page 2 of 5 <br />