My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
6100
>
2300 - Underground Storage Tank Program
>
PR0231630
>
REMOVAL_2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:31 PM
Creation date
3/21/2019 11:50:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
2006
RECORD_ID
PR0231630
PE
2361
FACILITY_ID
FA0003630
FACILITY_NAME
ARCO STATION #595*
STREET_NUMBER
6100
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08704034
CURRENT_STATUS
02
SITE_LOCATION
6100 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
264
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 .4 .6 PERSONNEL SAFETY EQUIPMENT <br /> The following personal protective equipment will be required AT ALL TIMES : <br /> Hard Hat <br /> Sturdy Work Boots <br /> Safety glasses <br /> - Reflective Safety Vest <br /> Nitrile gloves (required for personnel who will come in contact <br /> with soil or groundwater) . <br /> The following personal protective equipment will be optional or required as <br /> the need arises : <br /> - Hearing protection equipment <br /> Coveralls - disposable (Tyvek) , or fabric (any chemical protective <br /> needs) . <br /> Gloves <br /> Additional protection requirements are described in Section 6 . 0 . <br /> 3 .4.7 GENERAL SAFETY EQUIPMENT <br /> The following equipment must be available and easily accessible for use : <br /> First Aid Kit <br /> Fire extinguishers (Foam, dry chemical or carbon dioxide) <br /> Each company vehicle is equipped with the following items : <br /> - First Aid Kit <br /> - Fire Extinguisher <br /> - "Stop/Slow" traffic signs <br /> - Warning Triangle/Flare Kit <br /> 4.0 TRAINING <br /> All personnel who may be exposed to onsite contaminants must provide <br /> documentation of the following: <br /> - Current certification of 40 hours of (OSHA) classroom <br /> instruction/hands-on training to include: <br /> - Three days of field experience under the supervision an <br /> experienced supervisor. <br /> - Eight hours of annual classroom refresher training. <br /> - Eight hours of supervisory training if a team member is a <br /> designated supervisor. <br /> - Hazard communications training. <br /> 5.0 PROJECT-SPECIFIC TRAINING <br /> Project-specific training and information will be provided either before <br /> traveling to the site or at the site before entry into the exclusion zone. <br /> The information and training will be documented and will include the <br /> following: <br /> - The contents of this Health and Safety Plan <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.