My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_1984 - 1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
6100
>
2300 - Underground Storage Tank Program
>
PR0231630
>
BILLING_1984 - 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:42 PM
Creation date
3/21/2019 11:51:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
1984 - 1999
RECORD_ID
PR0231630
PE
2361
FACILITY_ID
FA0003630
FACILITY_NAME
ARCO STATION #595*
STREET_NUMBER
6100
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08704034
CURRENT_STATUS
02
SITE_LOCATION
6100 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
e" unces <br /> STATE OF CALIFORNIA P °+ <br /> STATE WATER RESOURCES CONTROL BOARD <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B = � -.40 <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION 0 7 PERMANENTLY CLOSED ONSITE <br /> ONE ITEM x 2 INTERIM PERMIT ❑ 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED ^ <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS-- SPECIFY IF UNKNOWN <br /> A. OWNER'S TANK I.D.# B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MO/DAYNEAR) D. TANK CAPACITY IN GALLONS: <br /> II.TANK CON S IFA-1 IS MARKED,COMPLETE ITEM C. <br /> 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C ❑ 1a REGULAR <br /> ❑ 3 DIESEL ❑ 6 AVIATION GAS <br /> A ❑ 2 PETROLEUM ❑ 80 EMPTY 1 PRODUCT ❑ 1b REMIUM ❑ 4 GASAHOL ❑ 7 METHANOL <br /> UNLEADED ❑ 5 JET FUEL <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE 2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME e <br /> SUBSTANCE STORED C.A.S.# <br /> III. TANK CONSTRUCTION MARKICIVE ITEM ONLY IN BOXES A.B,AND C,AND ALL THAT APPLIES IN BOX D AND E <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 4 SECONDARY CONTAINMENT (VAULTEDTANK) ❑ 99 OTHER <br /> B. TANK ❑ 1 BARE STEEL 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLE W/FRP <br /> (Primary Tank) ❑ 9 BRONZE 10 GALVANIZED STEEL ❑ 95 UNKNOWN ❑ 99 OTHER <br /> ❑ 1 RUBBER LINED ❑ ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> C.INTERIOR 5 GLASS LINING 6 NLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> LINING IS LINING MATERIAL COMPATIBLE WITH 100 METHANOL 7 YES NO <br /> D.CORROSION ❑ 1 POLYETHYLENE WRAP ❑ 2 COA G F—] 3 VINYL WRAP ❑ 4 FIBERGLASS REINFORCED PLASTIC <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE ❑95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF DERGROUND,BOTHIFAPPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A U 3 GRAVITY A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEA U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/COATING A U 8 1001% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTEC ION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION ❑ 1 AUTOMATIC LINE LEAK DETECTOR ❑ 2 LINE TIGH ESS TESTING ❑ 3 MOERSTI NG ❑99 OTHER <br /> TIAL <br /> V.TANK LEAK DETECTION <br /> ❑ 1 VISUAL CHECK ❑ 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORIN ❑ 4 AUTOMATIC TANK GAUGING ❑ 5 GROUND WATER MONITORING <br /> ❑ 6 TANK TESTING ❑ 7 INTERSTITIAL MONITORING ❑ 91 NONE t 95 UNKNOWN ❑ 99 OTHER <br /> VI.TANK CLOSURE INFORMATION <br /> 1.E TIMATE DATE LAST USED(MO/DAYNR) 2.ESTIMATED QUANTITY OF 3.WAS TANK FILLED WITH <br /> SUBSTANCE REMAINING GALLONS INERT MATERIAL? YES ❑ NO ❑ <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> APPLICANT'S NAME DATE <br /> (PRINTED&SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOW A (, I <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE I.D.# 3 <br /> PERMIJUMBER VERMIT APPROVED BY/,DATE PERMIT EXPIRATION DATE <br /> 1 <br /> FORM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. <br /> FOR003a8-R5 <br /> v <br />
The URL can be used to link to this page
Your browser does not support the video tag.