My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BILLING_2001 - 2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
6100
>
2300 - Underground Storage Tank Program
>
PR0231630
>
BILLING_2001 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:42 PM
Creation date
3/21/2019 11:54:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
BILLING
FileName_PostFix
2001 - 2006
RECORD_ID
PR0231630
PE
2361
FACILITY_ID
FA0003630
FACILITY_NAME
ARCO STATION #595*
STREET_NUMBER
6100
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08704034
CURRENT_STATUS
02
SITE_LOCATION
6100 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 K TIFIRn PROCR A M r0NCni J n A T F n UP- -1 <br /> TANKS <br /> UNDERGROUND STORAGE TANKS -TANK PAGE 2 <br /> Page of <br /> VI.PIPING CONSTRUCTION(check au that apply) <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SYSTEM TYPE ®1.PRESSURE ❑2.SUCTION ❑3.GRAVITY 458. ❑1.PRESSURE ❑2.SUCTION ❑3.GRAVITY 459. <br /> CONSTRUCTION/ ❑1.SINGLE WALL ❑3.LINED TRENCH ❑99.OTHER 460. ❑1.SINGLE WALL ❑95.UNKNOWN 462. <br /> MANUFACTURER <br /> ®2.DOUBLE WALL ❑95.UNKNOWN ❑2.DOUBLE WALL ❑99.OTHER <br /> MANUFACTURER 461. 1 MANUFACTURER 463. <br /> [11.BARE STEEL ❑6.FRP COMPATIBLE W/100%METHANOL ❑1.BARE STEEL ❑6.FRP COMPATIBLE W/100%METHANOL <br /> ❑2.STAINLESS STEEL ❑7.GALVANIZED STEEL ❑2.STAINLESS STEEL ❑7.GALVANIZED STEEL <br /> ❑3.PLASTIC COMPATIBLE WITH CONTENTS ❑95.UNKNOWN ❑3.PLASTIC COMPATIBLE W/CONTENTS ❑8.FLEXIBLE(HDPE) ❑99.OTHER <br /> ®4.FIBERGLASS ❑8.FLEXIBLE(HDPE) [199.OTHER ❑4.FIBERGLASS [19.CATHODIC PROTECTION <br /> ❑5.STEEL W/COATING ❑9.CATHODIC PROTECTION 464. ❑5.STEEL W/COATING ❑95.UNKNOWN 465. <br /> VII.PIPING LEAK DETECTION(check au that y)(A 'pdon ofthe monitoring program shall be submitted to the local .) <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SINGLE WALL PIPING 466. SINGLE WALL PIPING 467, <br /> PRESSURIZED PIPING(Check all that apply): PRESSURIZED PIPING(Check all that apply): <br /> ❑1. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP [11. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP <br /> SHUT-OFF FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION SHUT OFF FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION <br /> +AUDIBLE AND VISUAL ALARMS. +AUDIBLE AND VISUAL ALARMS. <br /> [12. MONTHLY 0.2 GPH TEST [12. MONTHLY 0.2 GPH TEST <br /> [33. ANNUAL INTEGRITY TEST(0.1 GPH) ❑3. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> [14. DAILY VISUAL CHECK <br /> CONVENTIONAL SUCTION SYSTEMS CONVENTIONAL SUCTION SYSTEMS(Check all that apply) <br /> ❑ <br /> S. DAILY VISUAL MONITORING OF PUMPING SYSTEM+TRIENNIAL PIPING <br /> INTEGRITY TEST(0.1 GPH) [35. DAILY VISUAL MONITORING OF PIPING AND PUMPING SYSTEM <br /> SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): [16. TRIENNIAL INTEGRITY TEST(0.1 GPH) <br /> ❑7. SELF MONITORING SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): <br /> GRAVITY FLOW ❑7. SELF MONITORING <br /> [19. BIENNIAL INTEGRITY TEST(0.1 GPH) GRAVITY FLOW(Check all that apply): <br /> [18. DAILY VISUAL MONITORING <br /> [19. BIENNIAL INTEGRITY TEST(0.1 GPH) <br /> SECONDARILY CONTAINED PIPING SECONDARILY CONTAINED PIPING <br /> PRESSURIZED PIPING(Check all that apply): PRESSURIZED PIPING(Check all that apply): <br /> 10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL 10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL <br /> ALARMS AND(Check one) ALARMS AND(Check one) <br /> ❑a. AUTO PUMP SHUT OFF WHEN A LEAK OCCURS ❑a. AUTO PUMP SHUT OFF WHEN A LEAK OCCURS <br /> ❑b.AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM ❑b.AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM <br /> DISCONNECTION DISCONNECTION <br /> ❑c. NO AUTO PUMP SHUT OFF ❑c. NO AUTO PUMP SHUT OFF <br /> ®11. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST)WITH FLOW SHUT <br /> OFF OR RESTRICTION ❑11.AUTOMATIC LEAK DETECTOR <br /> ❑12. ANNUAL INTEGRITY TEST(0.1 GPH) ❑12.ANNUAL INTEGRITY TEST(0.1 GPH) <br /> SUCTION/GRAVITY SYSTEM SUCTION/GRAVITY SYSTEM <br /> ®13. CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS [113.CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS <br /> EMERGENCY GENERATORS ONLY(Check all that apply) EMERGENCY GENERATORS ONLY(Check all that apply) <br /> [114. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF ❑14. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF <br /> AUDIBLE AND VISUAL ALARMS AUDIBLE AND VISUAL ALARMS <br /> [115. AUTOMATIC LINE LEAK DETECTOR (3.0 GPH TEST) WITHOUT FLOW ❑ <br /> SHUT OFF OR RESTRICTION I5. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST) <br /> ❑16. ANNUAL INTEGRITY TEST(0.1 GPH) ❑16.ANNUAL INTEGRITY TEST(0.1 GPH) <br /> [317. DAILY VISUAL CHECK ❑17. DAILY VISUAL CHECK <br /> VIII.DISPENSER CONTAINMENT <br /> DISPENSER CONTAINMENT 468. ❑1. FLOAT MECHANISM THAT SHUTS OFF SHEAR VALVE [14. DAILY VISUAL CHECK 469. <br /> DATE INSTALLED ❑2. CONTINUOUS DISPENSER PAN SENSOR+AUDIBLE AND VISUAL ALARMS ❑5. TRENCH/LINER MONITORING <br /> 1999 ®3. CONTINUOUS DISPENSER PAN SENSOR WITH AUTO SHUT OFF FOR ❑6. NONE <br /> DISPENSER+AUDIBLE AND VISUAL ALARMS <br /> IX.OWNER/OPERATOR SIGNATURE <br /> I certify $at the information provided herein is true and accurate to the best of my knowledge. <br /> SIGNA F WNER/ R, DATE:2/21/2003 470, <br /> NAMEt� WNER/OPERATOR(print): .1011I1 Schetter TITLE OF OWNER/OPERATOR: Compliance Specialist 47� <br /> Permit Number(Agency use only) 473. Permit Approved By(Agency use only) 474. Permit Expiration Date(Agency use only) 475. <br />
The URL can be used to link to this page
Your browser does not support the video tag.