My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987 - 2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
6100
>
2300 - Underground Storage Tank Program
>
PR0231630
>
COMPLIANCE INFO_1987 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:11 PM
Creation date
3/21/2019 12:02:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987 - 2006
RECORD_ID
PR0231630
PE
2361
FACILITY_ID
FA0003630
FACILITY_NAME
ARCO STATION #595*
STREET_NUMBER
6100
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08704034
CURRENT_STATUS
02
SITE_LOCATION
6100 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a �a �1116i�lmii COPY <br /> Associated Environmental Systems, Inc. P. O. Box 804`7 <br /> Bakersfield , CA 93380 <br /> (805) 3931'-1221121 <br /> PRECISION TANK & LINE TEST RESULTS <br /> Invoice Address: Tarek Location: W. O. #: 8779 <br /> ARCO PRODUCTS COMPANY ARCO SS #595 I. D. Number: 095 <br /> P. O. BOX 0811 6100 NORTH HWY 99 Technician: RLP, <br /> SAN MATEO, CA 94402 STOCKTON, CA Tech. #:89 154 Van#:6 108 <br /> Date: 04/17/89 Time Start : 08:00 End: 17:30 County: SJ <br /> Facility Phone#: 209-931-0976 Groundwater Depth: 20+ Blue Prints: N/A <br /> Contact : MGR Date;Time system was filled: 04/17/89 08:00 <br /> Tank Fill/Vent Product Type Of Vapor Inches of Pump Tank <br /> Tank Capacity Product Tank Vapor Lines Line Recovery (dater/Tank Type Material <br /> 1 12K S/UL PASS PASS PASS F'H NONE TURB DWF <br /> 12K REG PASS FAIL PASS PH-2 NONE TURB DWF <br /> 12K R/UL PASS PASS PASS PH-2 NONE TURB DWF <br /> 4 <br /> 5 <br /> E <br /> Additional Information% UNABLE TO FILL REG SYSTEM ABOVE 15" BELOW GRADE. <br /> VAPOR POT DID FILL. ALL SYSTEMS HAVE VAPOR POTS. <br /> SITE LOG TIME <br /> Set Up Equip: 11 :00 <br /> Bled Product Lines: 11 :05 <br /> Bled Vapor Lines: 11 : 10 <br /> Bled Vent lines: 11 . 15 <br /> Bled Turbine: 11 :05 <br /> Bled Suction Pump: N/A <br /> Risers Installed: NO <br /> a) This system and method meets the criteria set forth in NFPA #329. <br /> b) Any failure listed above may require further action, check with <br /> all regulatory agencies. <br /> Date <br /> e <br /> Certified Technician Signature ��_�.< <. ��__� <br />
The URL can be used to link to this page
Your browser does not support the video tag.