My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987 - 2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
6100
>
2300 - Underground Storage Tank Program
>
PR0231630
>
COMPLIANCE INFO_1987 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:11 PM
Creation date
3/21/2019 12:02:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987 - 2006
RECORD_ID
PR0231630
PE
2361
FACILITY_ID
FA0003630
FACILITY_NAME
ARCO STATION #595*
STREET_NUMBER
6100
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08704034
CURRENT_STATUS
02
SITE_LOCATION
6100 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14. ARCO #595, 5100 N . Hwy. 99/Hammer Ln. , Stockton, CA <br /> 1141114 of f40ppee4 owner or DMNn <br /> Addreta No.and SIrNt(f) City Suta Dna of Test <br /> 15. TANK TO TEST 16. CAPACITY From <br /> IJi74 on Chart <br /> Nominal Capacity d 0 By most accurste <br /> Iderillify by Position Gallons Capacity chart available Tank Manufacturer's Chart <br /> Dations . <br /> J Company Engineering Data <br /> Is here doubt a to True Capacity? <br /> �J Charts supplied with PtFQ� <br /> tend and rraw See SWiCin"DETERMINING TANK CAPACITY- �RSrR <br /> J <br /> Other <br /> 17. FILL-UP FOR TEST Stick Readings Total Gallons <br /> Stick Wetter Bottom to%in. Gallons as. Reading <br /> berfol n&4* <br /> to K In. Gallons Inventory <br /> Fla up.STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY <br /> Tank Diameter <br /> Product in full tank(up to rill pipe) _ <br /> IS. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK VAPOR RECOVERY SYSTEM <br /> See manual sections applicable.Cheek below and record procedure in lop(26). <br /> Stage I <br /> Water In tank High water table In tank excavation [:] Llne(s)being tested with LVLLT <br /> 19. TANK MEASUREMENTS FOR 21. TEMPERATURE/VOLUME FACTOR (a)TO TEST THIS TANK <br /> TSTT ASSEMBLY Is Today Writer?I 1 Colder?I ; F Product in Tank F Fill-up Product on Truck F Expected Change 1 or - I <br /> Bottom of tank to Grades.................... a <br /> Add 3r for 4"L ........... 22. ThermaESenaw reading after circulation .F <br /> digits Nearest <br /> Add 24-ter r L or sir seal ....... <br /> 13. Oiglts per•F In range of expected eftange <br /> Total tubing to asawrtble Approximate ........ rr <br /> drgAs <br /> 10. EXTENSION HOSE SETTING 24. x s COC) - <br /> Tank top to grade................................... full tank(ib w 17)3S totes Quantity M coeffitlent of expansion for volume change in this tank gallons <br /> hose on suction tote e'or mon Involved product per•F <br /> C <br /> below tank top ......................I......I....... 4; ' rr 25. <br /> + This Is <br /> 'If Fill pipe extends above grade,use top of lip. volume Change per'f(24) Dios per'F In test Volume Change per digit. test <br /> Range(23) Compute to 4 decimal places. fades(a) <br /> OBSERVED GRAVITY <br /> OBSERVED TEMPERATURES <br /> CORRECTED API GRAVITY <br /> C. O. E. SP1 % <br />
The URL can be used to link to this page
Your browser does not support the video tag.