My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987 - 2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
6100
>
2300 - Underground Storage Tank Program
>
PR0231630
>
COMPLIANCE INFO_1987 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:11 PM
Creation date
3/21/2019 12:02:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987 - 2006
RECORD_ID
PR0231630
PE
2361
FACILITY_ID
FA0003630
FACILITY_NAME
ARCO STATION #595*
STREET_NUMBER
6100
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08704034
CURRENT_STATUS
02
SITE_LOCATION
6100 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
14. ARCO #595, 5100 N . Hwy. 99/Hammer Ln. , Stockton, CA <br /> Nafne of feppta,Owner or peeler Addreae No.and stf"I(s) Clty Stat* DU*or Test <br /> 15. TANK TO TEST 16. CAPACITY From <br /> ^�tn <br /> on Cha <br /> Q <br /> Nominal Capacity- '� capacity <br /> mots accaccurateaccuratepacity chart awilable � Tank Manufacwrer's Chan <br /> S WenMh oy 0""A Oanons Gallons <br /> _J Company Engineering Data <br /> tt & Is tMre doubt at to True Capacity) ❑ ;-1 Chans supDd-ed with p�fQ�! <br /> grand and Grade $al Seotlon"DETERMINING TANK CAPACITY" _'—erT'R <br /> Other <br /> 11. Fill-UP FOR TEST Stick Readings Total Gallons <br /> snot watts bottom 1-01— to%In. Gallons ea. Reading <br /> Delos F14 up _ <br /> to% In. Gallons Inventory <br /> Fir up.STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY <br /> Tarek Diameter /f, Product In full tank(up to Rr pipe) _ <br /> 18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK VAPOR RECOVERY SYSTEM <br /> See manual sections applicable.Check below and record procedure in log(26). <br /> ElWaterin tank El High water table In tank excavation 11 Stage I <br /> ❑ LI ne(s)being tested with LVLLT ❑l�&tage If <br /> 19. TANK MEASUREMENTS FOR 21. TEMPERATURE/VOLUME FACTOR (a) TO TEST THIS TANK <br /> TSTT ASSEMBLY Is Today Warmer?I J Colder?I ; F Product in Tank _•F FIU-up Product on Truck __'F Expected Change I or I <br /> Bottom of tank to(rade•.................... /3 <br /> 22. Thermal-Sensor reading after circulationF <br /> Add W Iw 4"L ................. — dvs Nearest <br /> Add 24"for Y L or air seal ....... 23. 040ts par•F In range of expected change <br /> Total tubing to assemble Approximate „ dprts <br /> 20. EXTENSION HOSE SETTING 24. x , (0 DD <br /> total quantity In gallons top m grade- .... r fur tank(tb or 17) l �� (Of expansion for volume Change in this tank <br /> product <br /> Eeer+d hose on auction tube 4'or mon Per•F <br /> below tank top . ............. ..................... �__" 25. <br /> + � This it <br /> "If Fill Pipe extends above grade,use top of fill. volume change per•F(24) Digits per'F In lett Volume change per digit. tett <br /> Range(23) Compute to 4 decimal places. factor(a) <br /> OBSERVED GRAVITY - <br /> OBSERVED TEMPERATURES <br /> CORRECTED API GRAVITY <br /> C. 0. E. <br />
The URL can be used to link to this page
Your browser does not support the video tag.