My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1987 - 2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
6100
>
2300 - Underground Storage Tank Program
>
PR0231630
>
COMPLIANCE INFO_1987 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:11 PM
Creation date
3/21/2019 12:02:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1987 - 2006
RECORD_ID
PR0231630
PE
2361
FACILITY_ID
FA0003630
FACILITY_NAME
ARCO STATION #595*
STREET_NUMBER
6100
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08704034
CURRENT_STATUS
02
SITE_LOCATION
6100 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LDT 880 - LEAK Dt I t(: I UH UH tUKL15 1 0 <br /> _ D <br /> C NTP,4CTOR' CUSTOMER - <br /> 2 <br /> DATE JPROD T LOCATION <br /> 1_2 <br /> TECHNIC&N <br /> i Y`I � � ':..fit.- •��)N <br /> I SUBMERSIBLE PUMP IDENTIFICATION <br /> CHECK MFG. RECORD SERIAL # Nom} �v, <br /> INDICATE MODEL NO, IF KNOWN <br /> RED GILBARCO BENNETT DRESSER A.O.SMITH BOWSER SOUTH OTHER <br /> TOKHEIM <br /> JACKET WAYNE ] KEENE WEST <br /> II LEAK DETECTOR IDENTIFICATION <br /> CHECK TYPE <br /> I <br /> RED JACKET RED JACKET RED JACKET TOKHEIM OTHER <br /> MODEL 116-030 MODEL 116-017 MODEL 116-011 A MODEL 585PM <br /> PLD-2SEC DLD 2SEC DLD 5SEC DLD 2SEC <br /> HEX HEAD HEX HEAD ROUND HEAD SQUARE HEAD <br /> PRE-TEST CONDITIONS <br /> VOLUME OF PRODUCT FLUSHED THRU LINE 2— GALLONS <br /> OTHER COMMENTS <br /> TEST PROCEDURE <br /> LEAK DETECTOR INSTALLED LEAK DETECTOR ISOLATED <br /> TEST AT DISPENSER FROM PRODUCT LINE-TEST AT PUMP PIT <br /> REFER TO LDT INSTRUCTIONS <br /> III GENERAL LINE AND PUMP INFORMATION III GENERAL PUMP INFORMATION <br /> RECORD OPERATING PUMP PRESSURE Z�^ psig. FLUSH LDT TESTOR <br /> AIR-VAPOR TEST WITH PUMP OFF MEASUR9 RECORD OPERATING PUMP PRESSURE psig. <br /> AND RECORD I L ML <br /> IV PRESSURE STEP TEST IV PRESSURE STEP TEST-SUBMERSIBLE PUMP <br /> REMAINS ON THRU-OUT TEST PROCEDURE <br /> WITH BOTTOM SELECTOR IN PRESSURE STEP TEST WITH BOTTOM SELECTOR IN PRESSURE STEP TEST <br /> POSITION TURN ON PUMP POSITION ROTATE ISOLATOR FULLY(CC/W) <br /> RECORD TIME IN SECONDS GUAGE / RECORD TIME IN SECONDS GUAGE <br /> NEEDLE REMAINS IN COLORED ZONE ( SEC. NEEDLE REMAINS IN COLORED ZONE SEC. <br /> 1p <br /> V 3 GALLON PER HOUR LEAK SIMULATED TEST V 3 GALLON PER HOUR LEAK SIMULATED TEST <br /> WITH BOTTOM SELECTOR IN 3 GPH TEST POSITION WITH BOTTOM SELECTOR IN 3 GPH TEST POSITION <br /> A) MEASURE AND RECORD VOLUME INA) MEASURE AND RECORD VOLUME IN <br /> CALIBRATED BEAKER FOR 60 SECOND TEST L"J ML CALIBRATED BEAKER FOR 60 SECOND TEST ML <br /> B) OPEN DISPENSER NOZZLE OR PLACE BOTTOM B) PLACE BOTTOM SELECTOR IN DISPENSER <br /> SELECTOR IN DISPENSER NOZZLE POSITION. NOZZLE POSITION. <br /> FLOW RATE OF APPROX. 1'12-3GAL PER MINUTE FLOW RATE OF APPROX. 112-3GAL PER MINUTE <br /> WILL BE OBSERVED. WILL BE OBSERVED. <br /> DOES GUAGE NEEDLE MOVE TO LOWER DOES GUAGE NEEDLE MOVE TO LOWER <br /> END OF COLORED ZONE YES NO END OF COLORED ZONE YES NO <br /> DOES FLOW RATE INCREASE TO APPROX. DOES FLOW RATE INCREASE TO APPROX. <br /> V/2-3GAL PER MINUTE YESP/ NO V/2-3GAL PER MINUTE YES NO <br /> C) CLOSE DISPENSER NOZZLE OR PLACE BOTTOM C) PLACE BOTTOM SELECTOR IN <br /> SELECTOR IN 3GPH TEST POSITION: 3GPH TEST POSITION: <br /> GUAGE RETURN TO COLOREDGUAGE RETURN TO COLORED <br /> /� <br /> ZONE YES tNO__ ZONE YES NO <br /> GUAGE DOES NOT RETURN TO GUAGE DOES NOT RETURN TO <br /> COLORED ZONE YES NO COLORED ZONE YES NO <br /> GAUGE GOES TO OPERATING GAUGE GOES TO OPERATING <br /> PRESSURE YES NO PRESSURE YES-NO— <br /> LEAK <br /> ESNOLEAK DETECTOR TEST PASS LEA( DETECTOR TEST PASS <br /> FAIL[�L FAIL <br /> PURPORA VAPORLESS FORM 880A <br />
The URL can be used to link to this page
Your browser does not support the video tag.