Laserfiche WebLink
GENERAL NOTES REVISIONS <br /> 1. THIS PLAN SHOWS GENERAL DEMOLITION WORK TO BE <br /> PERFORMED AND DOES NOT RELIEVE THE CONTRACTOR <br /> FROM OTHER DEMOLITION WORK REQUIRED TO PRODUCE <br /> THE BUILDING MODIFICATIONS SHOWN ON THE REMAINING <br /> CONTRACT DOCUMENTS. THE CONTRACTOR SHALL <br /> COORDINATE AND VERIFY THE ENTIRE DEMOLITION SCOPE <br /> AND LOCATION OF TEMPORARY EQUIPMENT WITH THE <br /> ARCHITECT OF RECORD AND WINCO CONSTRUCTION <br /> MANAGER. ARCH.PROJECT NO. <br /> 2. PROTECT ALL EXISTING ELEMENTS SHOWN TO REMAIN 2011 <br /> WN <br /> FROM DAMAGE DURING CONSTRUCTION, FOR THE EXTENT RB <br /> OF THE DEMOLITION AND MODIFICATION. PROVIDE A CHECKED <br /> TEMPORARY DUST PARTITION TO PREVENT DUST AND KB,BTH <br /> DEBRIS FROM SETTLING ON ADJACENT AREAS NOT UNDER suBMrrTAi,DATEs <br /> 7 8 9 CONSTRUCTION AND AS DIRECTED, REVIEWED AND <br /> APPROVED BY THE WINCO COSNTRUCTION MANAGER. OTB DATE <br /> 3. CONTRACTOR SALVAGE ITEMS SHALL BE DISPOSED OF 11/24/2020 <br /> PROPERLY OFF SITE AND IN A EXPEDITIOUS MANNER. <br /> 4. THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE <br /> WORK USING THE CONTRACTOR'S BEST SKILL AND <br /> ATTENTION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR a F <br /> AND HAVE CONTROL OVER CONSTRUCTION MEANS, °a o °a w <br /> o d0.V �p <br /> j METHODS, TECHNIQUES, SEQUENCES, (UNLESS A SEQUENCE ¢o F w <br /> r-=--------I. - - - - - - ---- -II4iIIII <br /> IItIIIII <br /> ----------------------------------�-_-�_-_-_-_-6--------_-_--J_-�-i_-_-_-_-_-i�-ii- <br /> --------------------J--�-U 1ii' iWV.h� <br /> --i' <br /> - --_----_�---=-=--J <br /> Vg¢❑a <br /> ____---------- r -----------1----------- 1 -------- <br /> _ __ 1 --------------------------- IS SPECIFIED BY THE OWNER OR CONTRACT DOCUMENTS)________--� -------- �, <br /> oym�mFOzrU,ll <br /> hV5 <br /> ao� <br /> -- -,--------------- ---- -------------------- ------------- - - - == ________________---_--_----_----_--_----_ AND PROCEDURES, AND FOR COORDINATING ALL PORTIONS <br /> ---------- -------- ------- -------------- - - ------------------ --- -------- <br /> ----------- <br /> ---------------- - O„ a �U' W-r�-r, <br /> OF THE <br /> ORK <br /> ______ O�v - � _ _ ____________ _- n�--------------- __ ------- - - -F-____--___________- <br /> ----------- _-�_-� <br /> ---' - . <br /> REFER TO THE PLUMBING, ELECTRICAL AND <br /> --- � _ c - REFRIGERATION DRAWINGS FOR ADDITIONAL SCOPE.------------------------------=a _ 6 METHODS AND SEQUENCE OF WORK AS RELATED TO STORE <br /> '�_ _ _ OPERATI N ARESUBJECT TO APPROVAL BY OWNER. O0.v <br /> 7. PRIOR TO CONSTRUCTION CONTRACTOR SHALL VISIT THE <br /> I, li <br /> _ --= <br /> ,__ <br /> -- `',' -�--------------------------------------------- <br /> -------------I --------I w----� i I. i i',', _____, SITE TO BECOME FAMILIAR WITH ALL CONDITIONS THAT !„ <br /> - „ E DELI <br /> (E) SERVICE ,' AFFECT ALL PORTIONS OF THE WORK. COORDINATE WITH <br /> WRAP (E) SERVICE <br /> II --------- ''' DELI �. <br /> � _--______ <br />