Laserfiche WebLink
REVISIONS <br /> GENERAL NOTES <br /> 1. THE REFRIGERATION CONTRACTOR SHALL INVESTIGATE AND <br /> ENSURE COMPLIANCE WITH ALL FEDERAL, STATE, AND LOCAL <br /> CODES PRIOR TO INSTALLATION. THE ENTIRE INSTALLATION <br /> SHALL BE IN ACCORDANCE WITH ALL APPLICABLE CODES. <br /> 2. UPON COMPLETION OF INSTALLATION, REFRIGERATION <br /> CONTRACTOR TO ENSURE ALTERED PROTOCOL UNITS ARE 2011 PROJECT NO. <br /> 2011 <br /> PROPERLY CHARGED WITH REFRIGERANT. DRAWN <br /> 3. COMPLY WITH ALL FEDERAL, STATE AND LOCAL REGULATIONS JR <br /> REGARDING REFRIGERANT RECLAIMING, SYSTEM EVACUATION, m CHECKED <br /> MC <br /> EQUIPMENT, OIL AND REFRIGERANT DISPOSAL. SUBMITTAL DATES <br /> 4. COMPLETE THE APPROPRIATE WINCO FOODS REFRIGERANT <br /> TRACKING FORMS AND PROVIDE DOCUMENTATION THAT ALL <br /> OTHER REGULATIONS HAVE BEEN COMPLIED WITH. OTB DATE <br /> 11/24/2020 <br /> 7 8 9 <br /> KEYED NOTES ° <br /> W cCFF��a U- <br /> 1. <br /> 1. REFRIGERATION CONTRACTOR TO TEMPORARILY SET EXISTING U`a u 4�° <br /> CASE ON SALES FLOOR WHILE NEW CASE IS BEING INSTALLED. i N <br /> PROVIDE ALL NECESSARY EXTENTIONS FOR REFRIGERANT LINES, N o , o o d o <br /> _ CONTROL WIRES AND DRAIN LINES TO ACCOMMODATE THE _ I W <br /> TEMPORARY LOCATION. <br /> 2. WHEN NEW INSTALLATION IS COMPLETE, CONTRACTOR TOEE co <br /> N2�V Z m 3 N <br /> REMOVE AND/OR RECYCLE EXISTING FIXTURE. COORDINATE w <br /> T-7 �� DISPOSAL WITH OWNER AND COMPLY WITH ALL REFRIGERANT o <br /> TRACKING SPECIFICATIONS. <br /> J <br /> 3. EXISTING FLOOR SINK TO BE DEMOLISHED. RE: P0. <br /> L (D <br /> Le� <br /> 01� <br /> ' v <br /> �P <br /> b.hills architecture, PC <br /> Fq 3156 south bown way <br /> boise Idaho 1 83306 <br /> p . 2 0 8 . 2 5 8 . 6 1 5 0 <br /> (::GD- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - www . bhillsarch . com <br /> CDCDQROFESS/q <br /> H. <br /> �P <br /> 885 � <br /> O * XP: 12/31/21 <br /> OF CA r-O���P <br /> 11/18/2020 <br /> W O <br /> \x <br /> O O ►� ►� <br /> O0 <br /> � o <br /> 0C <br /> 7 8 9 <br /> PARTIAL REFRIGERATION DEMOLITION PLAN - <br /> NORT <br /> 1/4" — 1'-0" <br /> SHEET TITLE <br /> PARTIAL <br /> REFRIGERATION <br /> w DEMO PLAN <br /> SHEET <br /> ROO <br /> N <br /> O <br /> N <br /> 00 <br />