My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PAVILION
>
2850
>
1600 - Food Program
>
PR0535710
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2024 2:19:47 PM
Creation date
3/21/2019 1:14:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0535710
PE
1619
FACILITY_ID
FA0020585
FACILITY_NAME
WinCo Foods #103
STREET_NUMBER
2850
STREET_NAME
PAVILION
STREET_TYPE
Pkwy
City
Tracy
Zip
95304
CURRENT_STATUS
01
SITE_LOCATION
2850 Pavilion Pkwy
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL NOTES REVISIONS <br /> 1. FIXTURES ARE SHOWN 1N A HALF TONED LINE TYPE FOR No. Description Date <br /> COORDINATION PURPOSES. RE:FPI &FP2 FOR DIMENSIONS <br /> OF FIXTURES. <br /> EXTEND S.S.CORNER 2. EXTEND RUBBER BASE A NIINUVIUM OF 6",MAXIMUM OF 12" <br /> TO FLOOR AND ABUT <br /> ' BEHIND GONDOLA SHELVING,REFRIGERATED CASES AND <br /> RUBBER BASE TO S.S. PALLET RACKING. <br /> CORNER 3. PROVIDE MANUFACTURER SPECIFIED MOISTURE TESTING OF <br /> CONCRETE PRIOR TO INSTALLATION OF ANY RESINOUS <br /> RUBBER BASE @ STAINLESS RESINOUS FLOORING,CLEAN AND <br /> STEEL CORNER GUARDS PREPARE SUBSTRATE PER FLOORING. <br /> 1802 <br /> ARCH.PROJECT NO.OXES AND CLEAN OUTS THROUGHOUT THE STORE <br /> 4. J B <br /> MANUFACTURER RECOMMENDATIONS WALL FINISH,RE:Al l ARE TO BE FLUSH WITH FINISH FLOOR MATERIAL, DRR <br /> AWN <br /> 3++ J TRIM& SEALANT 5. SET RUBBER BASE IN A BED OF CLEAR SILICON. C.BJD.M. <br /> CHECKED <br /> D.C]C_P. <br /> FINISHED WALL, <br /> sUBNnrrAt,DAx13s <br /> EQUIPMENT OR CASEWORK, <br /> ,; loo'-0" KEYED NOTES <br /> RE:Al 1 s. •, r ;. ;: ors DATE <br /> , "�-�`�:T�' `�.,7 Li <br /> .:,• `:..��: 2"RADIUS RESINOUS <br /> RUBBER BASE,RE:A9 = �' , • .1. ;'° °; ; °;: 112"MARINE GRADE <br /> M i't ° <br /> 4.: PLYWOOD BEHIND SPOON COVE,RE:A9 <br /> _ 'r• a i:° :a a oa a RESINOUS BASE, RESINOUS FLOORING <br /> _ -, ; .q • ; ; a a • • CHAMFER TOP100'-0" • d - 100'-0 <br /> 10. URETHANE OOBROADCAST <br /> , AGGREGATE, OLOR RAS RE: 096726 <br /> z� <br /> BUSH HAMMER, SAWCUT OR <br /> DRAIN OR CONCRETE MISCELLANEOUS o° w <br /> . , TROWEL RECESS IN <br /> HEATED FOR SMOOTH TRANSITION OF o <br /> NC DRAIN/FLOOR SINK AS OCCURS 5�ggo g'� <br /> THRESHOLD AS 61. NEW OR EXISTING FLOOR/TRE H a o° <br /> CONCRETE SLAB,RE:Al OCCURS RESINOUS FLOORING RE:Al &P1 o �� <br /> CONCRETE SLAB RE:Al � � �"�� <br /> �Tn �r �+ 63. TRANSITION FROM RESINOUS FLOORING TO FINISHED CONCRETE $ <br /> TYPE A RUBBER BASE EDGE OF "DESINOUS FLOC)RTNG <br /> TYPE 'K' RESINOUS COVE BASE OR DRAIN,RE:A9.1-3 A� oS <br /> a <br /> 1 12 <br /> 1 112" = 1'-0" 3 1211 - 1 r.olf11/2" 1-0 BASE <br /> A. 4"GRAY"FLEXCO WF-036"OR EQUAL RUBBER BASE,RE:A9,1-1 <br /> K. RESINOUS COVED BASE,RE:A9.1-12 (� <br /> 0 o�4 <br /> QA <br /> Ly <br /> W <br /> dL $0 <br /> H <br /> TE <br /> .� <br /> a <br /> v � c <br /> W � HO <br /> w <br /> Qa v � v <br /> o C) <br /> a a rn <br /> SHEET TITLE <br /> PLATFORM FLOOR FINISH <br /> PLAN AND DETAILS <br /> SHEET <br /> A9 . 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.