My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PAVILION
>
2850
>
1600 - Food Program
>
PR0535710
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/18/2024 2:19:47 PM
Creation date
3/21/2019 1:14:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1600 - Food Program
File Section
WORK PLANS
RECORD_ID
PR0535710
PE
1619
FACILITY_ID
FA0020585
FACILITY_NAME
WinCo Foods #103
STREET_NUMBER
2850
STREET_NAME
PAVILION
STREET_TYPE
Pkwy
City
Tracy
Zip
95304
CURRENT_STATUS
01
SITE_LOCATION
2850 Pavilion Pkwy
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\lsauers1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISIONS <br /> REFRIGERATION LEGEND <br /> SYMBOL DESCRIPTION <br /> ® TEMPERATURE PROBE <br /> °E ELECTRICAL CASE CONNECTION <br /> ARCH.PROJECT No. <br /> oDRAWN <br /> R REFRIGERATION CASE CONNECTION B <br /> DRAWN <br /> JR <br /> Es EPR WITH SUCTION STOP SOLENOID CHECKED <br /> MC <br /> HAND VALVE FOR ISOLATION AND SERVICING SUBMITTAL DATES <br /> 1 2 PROVIDED AND INSTALLED BY REFRIGERATION 08/01/ <br /> CONTRACTOR. OTB DATE <br /> TBD <br /> RT DEFROST TERMINATION T-STAT. w <br /> �a vwoF zd� <br /> DT DUAL TEMP SWITCH <br /> 0z <br /> 3°Foo ¢° x� <br /> � a z o <br /> a�wa�ai~ �� � ��z��Q� <br /> aH <br /> gm W FF <br /> � <br /> F Q d 0 v�z :1)Oda,�r [- <br /> GENERAL NOTES <br /> > <br /> +-% ONI� MU) N <br /> U) ` d- M E ami <br /> � <br /> 00 p oom <br /> +' 00 <br /> to <br /> 1. PIPING SHALL BE LOCATED SO THAT ACCESS TO THE SYSTEM N 0 "T M <br /> COMPONENTS IS NOT HINDERED AND THAT ALL COMPONENTS THAT Z w o NEr- <br /> COULD <br /> REQUIRE FUTURE MAINTENANCE ARE EASILY ACCESSIBLE. o 'o N x <br /> 2. THE REFRIGERATION CONTRACTOR SHALL REVIEW AND ti m n.42 n <br /> STRATEGICALLY LOCATE ALL CONTROL VALVES PRIOR TO THE <br /> INSTALLATION OF ANY PIPING. <br /> 2�- _ — — 1 — — — — — — — — — _ 2) 3. THE REFRIGERATION CASE MANUFACTURER SHALL FURNISH AND <br /> -- ----� INSTALL ONE ISOLATION LIQUID LINE HAND VALVE IN EACH REMOTELY <br /> REFRIGERATED CASE FOR CLEANING AND MAINTENANCE PURPOSES. <br /> 4. DRAWING IS SHOWN PARTIALLY DIAGRAMMATICALLY FOR CLARITY <br /> PURPOSES ONLY. EACH REFRIGERATION LINE DISPLAYED ACTUALLY — <br /> Es R I REPRESENTS A LIQUID AND SUCTION LINE PAIR PER CIRCUIT. <br /> 5. THE REFRIGERATION CONTRACTOR SHALL COORDINATE ALL PIPINGB"10 <br /> PATHS TO AVOID CONNECTIONS WITH ELECTRICAL PANELS, HALLWAYS. <br /> ABSOLUTELY NO PIPING SHALL PASS ABOVE ELECTRICAL PANELS AND QRo F E s sioN <br /> TRANSFORMERS OR THROUGH HALLWAYS. <br /> 6. THE REFRIGERATION CONTRACTOR SHALL COORDINATE ALL PIPING <br /> LBio.oiPATHS TO AVOID CONFLICTS WITH ALL OTHER TRADES. (LE. HVAC 3 No. 318s5 z <br /> UJ M <br /> --- <br /> I EQUIPMENT, HVAC DIFFUSERS, DUCT WORK, FLUES, LIGHT FIXTURES, <br /> PLUMBING LINES, DECOR, PALLET RACKING, ETC.) <br /> 7. THE REFRIGERATION CONTRACTOR SHALL INVESTIGATE AND ENSUREsq FFCNAN\�Po���`r <br /> COMPLIANCE WITH ALL FEDERAL, STATE, AND LOCAL CODES PRIOR TO °F CAU- 08/01/18 <br /> INSTALLATION. THE ENTIRE INSTALLATION SHALL BE IN ACCORDANCE <br /> WITH ALL APPLICABLE CODES. <br /> 8. MOUNT OVERHEAD REFRIGERATION LINES EITHER INSIDE OR WITHIN 3" <br /> OF BOTTOM OF BAR JOIST. ALWAYS MAINTAIN PROPER SLOPE BACK TO <br /> THE COMPRESSOR RACK, IF NECESSARY INSTALL INTERMEDIATE <br /> (C.9}-- - �I — - - — ED RISERS TO MAINTAIN ABOVE ELEVATION. M <br /> \ 9. SUCTION P-TRAPS TO BE SAME SIZE AS HORIZONTAL RUNS, REDUCE O <br /> J' WITH BUSHINGS AT THE TOP SIDE OF P-TRAP. INTERMEDIATE P-TRAP <br /> -- SIZE SHOULD BE THE SAME SIZE AS REDUCED RISER. • <br /> 10. TO FACILITATE MOVEMENT OF THE PIPING AS A RESULT OF Q <br /> \I I CONTRACTION AND EXPANSION DURING REFRIGERATION OPERATION <br /> \ �\ THE REFRIGERATION CONTRACTOR SHALL INSTALL EXPANSION LOOPS <br /> THROUGHOUT THE STORE'S REFRIGERATION PIPING IN FULL-� <br /> COMPLIANCE WITH THE ASHRAE STANDARDS AND LOCAL CODES AND <br /> REGULATIONS. PIPE HANGERS SUPPLIED AND INSTALLED BY THE O <br /> -- I 0 <br /> I REFRIGERATION CONTRACTOR MUST PERMIT FREE MOVEMENT OF THE <br /> REFRIGERANT LINES. <br /> _ <br /> \ —_� 11. INDIVIDUAL REFRIGERATION BRANCH SIZES ARE SHOWN ON THE <br /> --- - -- -- --� REFRIGERATION SCHEDULE. O <br /> 12. CASE TEMPERATURE PROBES SUPPLIED AND INSTALLED BY CASE �r- ll � ll <br /> - - ----: \�--- MANUFACTURER. V V <br /> ----- + + + +++l 13. REFRIGERATION CONTRACTOR TO WIRE AND TERMINATE ALL LOW <br /> + + + + + + VOLTAGE DEVICES. BELDEN 8762 OR EQUIVALENT. THIS WIRING SHOULD <br /> ++++++++++++ BE CAREFULLY ROUTED AWAY FROM POWER LINES OR OTHER HIGH N <br /> ++++++++++++ ELECTRICAL NOISE ENVIRONMENTS. <br /> + + + + + + 14. AFTER LINES ARE INSTALLED REFRIGERATION CONTRACTOR TO FILL <br /> + + + + _+ _+ OPENINGS IN CASES WITH EXPANDING FOAM INSULATION. <br /> .rPARTIAL REFRIGERATION PIPING PLAN x 15. UPON COMPLETION OF INSTALLATION, REFRIGERATION CONTRACTOR <br /> ���� \ I TO ENSURE ALTERED PROTOCOL UNITS ARE PROPERLY CHARGED WITH <br /> 3/16" = F-0" z REFRIGERANT. <br /> 16. COMPLY WITH ALL FEDERAL, STATE AND LOCAL REGULATIONS <br /> REGARDING REFRIGERANT RECLAIMING, SYSTEM EVACUATION, <br /> 1 2 EQUIPMENT, OIL AND REFRIGERANT DISPOSAL. <br /> 17. COMPLETE THE APPROPRIATE WINCO FOODS REFRIGERANT TRACKING <br /> FORMS AND PROVIDE DOCUMENTATION THAT ALL OTHER <br /> REGULATIONS HAVE BEEN COMPLIED WITH. <br /> KEYED NOTES <br /> 1. RUN NEW PIPING BACK TO RACK B GROUP 1. <br /> SHEET TITLE <br /> EFRIGERATION <br /> PIPING PLAN <br /> � SHEET <br /> .-- <br /> DC ENGINEERING <br /> Careful listening.Dynamic solutions. R2 <br /> www dtewineerinp.net <br /> -- Phone:208.288.2181 Project:18TAIOI-AS17 <br /> O <br /> N <br /> 00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.