My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1991 - 1999
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
6100
>
2300 - Underground Storage Tank Program
>
PR0231630
>
COMPLIANCE INFO_1991 - 1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
3/21/2019 1:23:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1991 - 1999
RECORD_ID
PR0231630
PE
2361
FACILITY_ID
FA0003630
FACILITY_NAME
ARCO STATION #595*
STREET_NUMBER
6100
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08704034
CURRENT_STATUS
02
SITE_LOCATION
6100 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
133
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> OWN <br /> MECHANICAL CONTRACTORS <br /> 1717 Doolittle Drive <br /> P.O.Box 5555 <br /> San Leandro,California 94577-0655 <br /> (510)895-2333 <br /> Contractors License No.184480 <br /> October 5, 1998 <br /> San Joaquin County Department of Environmental Health <br /> P.O. Box 388 <br /> Stockton, California 95201-0388 <br /> Attention: Eric Trevino <br /> Regarding: ARCO Facility Equipment Upgrades <br /> Ladies and Gentlemen: <br /> Scott Co. of California has been contracted by ARCO Products Company to perform upgrades <br /> on some of their fueling stations. <br /> In your jurisdiction,we will perform the following work: <br /> 1. ARCO #6020 1711 E. Yosemite,Manteca <br /> • Overspill prevention on all fill and stage I vapor lines <br /> • Product line monitoring system installation for continual line monitoring and <br /> turbine shutdown. <br /> • Overfill prevention on all fills with tank bottom protectors <br /> Product line monitoring system installation for continual line monitoring and <br /> turbine shutdown. <br /> 2. ARCO #434 501 W. Kettleman Lane, Lodi <br /> • Overspill prevention on all fill and stage I vapor lines. <br /> • Product line monitoring system installation for continual line monitoring and <br /> turbine shutdown. <br /> • Overfill prevention on all fills with tank bottom protectors. <br /> 3. ARCO #595 6100 N. Highway 99,Stockton <br /> • Product line monitoring system installation for continual line monitoring and <br /> turbine shutdown. <br />
The URL can be used to link to this page
Your browser does not support the video tag.