My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999 - 2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
6100
>
2300 - Underground Storage Tank Program
>
PR0231630
>
COMPLIANCE INFO_1999 - 2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
3/21/2019 1:29:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999 - 2000
RECORD_ID
PR0231630
PE
2361
FACILITY_ID
FA0003630
FACILITY_NAME
ARCO STATION #595*
STREET_NUMBER
6100
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08704034
CURRENT_STATUS
02
SITE_LOCATION
6100 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 N <br /> 6100 N Hwy 99 <br /> _I <br /> Abandoned pipe buried at 12" <br /> ..,,. ,Abandoned pipe buried at 3' <br /> • .... Current pipe buried at 8" <br /> s• <br /> w• <br /> w• <br /> STORE <br /> t <br /> Piping Removal Notes by Vidal Pedraza REHS <br /> 9/10/99 <br /> 1. Top of tank to grade 4ft <br /> 2. Contractors to rinse pipes and provide EHD with manifest. <br /> 3. Free product at dispensers located at the West Side of the store. <br /> -Contractor believed steel fittings leaked. <br /> -Steel pipe and fiberglass yellow pipe discovered at this time. <br /> -I called Kasey Foley, Lead Senior REHS,to ask her what to do with the spilled fuel. Kasey <br /> said that the free product and the saturated soil should be stored in drums labeled and hauled as <br /> hazardous waste. I told the contractor what my lead senior had said. Later Margaret Lagorio <br /> consented for the saturated soil to be mix with the stockpile. vp <br /> 4. Collected 5 samples. <br /> -DI @ 3' <br /> -DI @ 5' <br /> -D2 @ 5' <br /> -PL 1 @ 3.5' <br /> 5. Decided by contractor to come back Monday 9/13/99. <br /> 9/13/99 <br /> 1. Went thereat 10:00 am <br /> -Contractor was not ready, and asked me to come back at 2:00 pm <br /> 2. Went back at 2:00 pm <br /> -The contractor had found out more abandoned pipe and was in the process of uncovering it. <br /> 3. Postponed inspection for the 14'hat 10:00 am. <br /> 9/14/99 <br /> 1. All piping was removed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.