My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999 - 2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
6100
>
2300 - Underground Storage Tank Program
>
PR0231630
>
COMPLIANCE INFO_1999 - 2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
3/21/2019 1:29:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999 - 2000
RECORD_ID
PR0231630
PE
2361
FACILITY_ID
FA0003630
FACILITY_NAME
ARCO STATION #595*
STREET_NUMBER
6100
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08704034
CURRENT_STATUS
02
SITE_LOCATION
6100 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TAIT•& Associates, Inc. <br /> ZNT - � ► <br /> Engineering • Planning Surveying <br /> a <br /> August 6, 1999 X���0,. 0`9� ia: Overnight <br /> 999 <br /> Mr. Doug Wilson <br /> San Joaquin County L�CFS�Ty <br /> Department of Environmental Health <br /> 304 East Weber Avenue Third Floor <br /> Stockton, CA 95202 <br /> Phone (209) 468-3446 <br /> RE: ARCO Facility # 595 ARCO Facility # 6080 <br /> 6100 North Highway 99 85 East Louise Avenue <br /> Stockton, CA Lathrop, CA <br /> TAIT Job # AR 994 TAIT Job # AR 995 <br /> Dear Doug: <br /> On behalf of our client, ARCO Products Company, we wish to apply for a permit for the <br /> above locations. Enclosed is our submittal package: <br /> I. Three copies of the Closure Application and Installation Application <br /> 2. Application fee of$ 858.00 ($ 624.00 installation and $ 234.00 closure) <br /> 3. Detail sheets <br /> 4. Three sets of plans <br /> 5. Site safety and health plan <br /> 6. Contractor Information <br /> The scope of work will involve the following. Remove and replace the gasoline dispensers <br /> with new dispensers. Demolish the existing dispenser islands and construct new islands. <br /> Install new product and vapor recovery piping as needed from the dispenser islands to the <br /> storage tanks. Install new turbine sumps at top of tank. Please send a copy of the permits to <br /> my attention. <br /> In an effort to reduce some plan check comments that may arise I would like to provide the <br /> following statements: <br /> 1. Any concerns about the depth to grade of the dispenser sumps and piping will be evaluated <br /> at the time of excavation. If it is determined that the existing conditions do not provide <br /> proper piping slope details for piping low point including monitoring equipment will be <br /> provided to San Joaquin County Environmental Health. <br />
The URL can be used to link to this page
Your browser does not support the video tag.