Laserfiche WebLink
8. a. Describe the method that will be utilized to p e and/or inert the tank(s): <br /> b. Tank/Piping Hauler <br /> � <br /> Name <br /> Address City Zip <br /> Phone No{ <br /> Hauler Registration N(1f hauled as hazardous) <br /> C. TanklPiping Disposal Site: <br /> Name <br /> Address Cl Zip <br /> Phone No.(�\� <br /> EPA M#(if transported to a permitted TSD facility) <br /> 9. Is the sampling firm an independent third party from the contractor? YEN NO[] <br /> 9a. Describe,in detall,how the soil and/or water sample(s)beneath the tank and piping will be obtained: <br /> 10. Describe how the excavation will be backfilled with suitable material upon removal:- <br /> 11. <br /> emoval:11. Handling of excavated soil:- <br /> a)What material will be used to line the tank pit and cover the stockpile? <br /> b)What will be the final destination of the excavated stockpile? <br /> <�E,C\ <br /> c)Contaminated Soil Hazardous Waste Hauler. <br /> Name Hauler Registration MS <br /> Address City zip <br /> Phone No. <br /> EH M 046(Revised 10/19198) Page 5 <br />