Laserfiche WebLink
event of an emergency, a pumping contractor or truck will be available <br /> immediately. In all other cases, equipment availability will be within 12 <br /> hours. <br /> b. Any unauthorized release in the secondary containment system of a used oil <br /> tank will be pumped and disposed of following procedures in accordance <br /> with California Health and Safety Code requirements for used oil disposal. <br /> C. ARCO Maintenance will he responsible for authorizing and selecting <br /> contractors for the work to be performed. <br /> 5. TRAINING <br /> In addition to the training covering subjects mentioned in Sections 3 and 4 above, training <br /> needed for the operation of the tank system and monitoring equipment includes.- <br /> How <br /> ncludes:How to: <br /> Take tank level measurements <br /> - Read dispenser meters <br /> - Inspect equipment <br /> - Recognize warning signs: dispenser hesitations, meter spins and odors <br /> - Manually close dispenser impact valve <br /> - Replace dispenser filters <br /> Shut down the system with and location of: ARCOmatic switch, electrical panel <br /> breakers, and emergency shut off switch <br /> - Test the electronic monitor <br /> 6. RECORDS RETENTION <br /> Written records of all monitoring, testing, and maintenance performed shall he maintained <br /> on-site or off-site at a readily available location for a period of at least 5 years. These <br /> records must be made available, upon request within 36 hours, to the local agency or the <br /> Board. <br /> 7_ PARTY RESPONSIBLE FOR PERFORMING THE MONITORING <br /> Manager on Duty <br /> Name Title <br /> 3 <br /> LO'd OS2!9 V29 916 'oo si-ona021d 031IH d9C:eO 66-Ci -1�0 <br />