My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999 - 2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
6100
>
2300 - Underground Storage Tank Program
>
PR0231630
>
COMPLIANCE INFO_1999 - 2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
3/21/2019 1:29:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999 - 2000
RECORD_ID
PR0231630
PE
2361
FACILITY_ID
FA0003630
FACILITY_NAME
ARCO STATION #595*
STREET_NUMBER
6100
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08704034
CURRENT_STATUS
02
SITE_LOCATION
6100 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S-1 9-1 999 2.0,1 FIM FROM P. a <br /> � R;rQU1R£I? 11�iSr Ef��1�5 <br /> Note: The conmcaor's FHS-EHD approved plans of the UST irimllation shall he retained at :he <br /> job site and must be- shown to tine PHS-E HI3 inspector upon. request. In addition, the <br /> applicaDie fire department &hall approve the UST installation prior to cotraret C=ent of <br /> work. <br /> All appointments for i Mections must be made at least 48 hour's in advance. Below are LL- <br /> T <br /> lu <br /> minimum required inspections: <br /> a. Before irsm ation, the tam shall be tested for tightness at the installation sate itt accoraance <br /> with the manufacturer's written guidelines. If there are no �_!zidelines, the prim^t and <br /> secondary continent sl all be tested for tightness wiry± air pressure between 3 and 5 pounds <br /> per square inch. In lieu of a pritssure test, a vacu= expressed in inches of mercury in The <br /> interstitial space of the secondary containment, is accepcabie. The pressure (or vac:x= in <br /> the interstitial space) shall be maintained for a minim= of 3C minutes. <br /> b. All crew l;rXna_ry piping and secOnd2ry containment systems shall Ix tested for tigbaess after <br /> installation in accordance with msnutaCt- er's .guideliaes. Primary pressurized piping shall <br /> be bydrosrarically tested at 150 percent of design, operating pressure or pneur arically at 110 <br /> percent of design operating prsulre. if the calculated test pressure for pressurized piping is <br /> less than 40 psi. 40 psi shall be used as the test pressure. The pressure sh Q be -maintained <br /> for a miniauum of-10 minutles and all joints shall be soap tested. If there are no <br /> a=ufacmre:'s onideiines. secondary containment systems shall b4 t sted using an applicable <br /> rnethod specified in an industry code or engineering standard. <br /> c. <br /> All lines other liar. pressure piping shall be pressure tested at not less t= 3 p.s.;. and not <br /> mole u�an 5 p.s.i. for a minimum. of 50 minutes and soap tested wMe under pressure. <br /> d. Containment sps ;hall pass a 24 hour hydrostatic leak test. <br /> z. The spill container, shall be shown, .o be capable of draining liquid back into the fuel tanks. <br /> f. Tile monitoring syst M Shall pass a functional test. "Tae functional test smell Consist of rhe <br /> activation of rhe alarm via all monitoring probes/sensors. <br /> Final inspection and approval to operate wl be tentedr the aGove requirements ire <br /> satisfied and a hard copy of the tank integrity test [as required by Section ZZ635 (a) (5)) is <br /> submitv�d to the inspector at the site. <br /> If you treed fur*her assistance. or wis11 to schedule an appoinanent to discuss ;he plan review <br /> or Reid inspection, please contact our Under, ound Storage Tani: Staf;`at ('--09) 468-342 . <br />
The URL can be used to link to this page
Your browser does not support the video tag.