My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999 - 2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
6100
>
2300 - Underground Storage Tank Program
>
PR0231630
>
COMPLIANCE INFO_1999 - 2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
3/21/2019 1:29:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999 - 2000
RECORD_ID
PR0231630
PE
2361
FACILITY_ID
FA0003630
FACILITY_NAME
ARCO STATION #595*
STREET_NUMBER
6100
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08704034
CURRENT_STATUS
02
SITE_LOCATION
6100 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B-19-1999 2:02PM FROM P. 6 <br /> UST SYSTEM GRAYING 10ORMATIOM <br /> 1_ Three complete sets of plans (include raanufacturews specification sheets far proposed ecuipment to be instaited). <br /> � Alan drawn to reale in noA-erasabte print. <br /> 3, ptet plan to snow Location of ranks acid att associated, piping. ti( t �; � S �-f �VOWA <br /> 4, Str?kar ptatas or drop tuoe-aounted bottom protectors ittustmted below atl acceszitte open,nss. <br /> Tank cross•Sectionai diagram. <br /> oetai i 5f tank, "Sociatad piptrig, excavation and cover.. <br /> 7_ Sank(g) and pining approved by a rationally recognized independerr totting organization. -Title S, Chapter ib, <br /> Artiele 3, Section 2631 (b) & aWl <br /> g, verificarion of product convatnbitity with the tank(s), piping, mostitoring <br /> / device(s), epoxy or sitieone Slues, ate. <br /> 9. J` Manufacturer's written irstattation instructions for tank(z), piping, monitoring devices, etc. <br /> 10. At the instaltation site, prior to irgtattation, a tightness rest shall by performed on both primary (t°) and <br /> secondary (e) asntaic t systems before covering. tSeetion 2535 (a) (3) & (4)I <br /> LTank intzgrity test required upon cemptetion of instaitation with tank in operating condition. Test -vaults to by <br /> submitted directly to AHS-ENG from the testing company or owner of focility, [Health E Safety Code, Division 20, <br /> Chapter 6.7, Section 25291 (h)l <br /> 12. TANK COMipOSITION <br /> lSANK It <br /> CAPACITY i <br /> 1� M"UFACTURER <br /> OMMSITION <br /> I PRODUCT <br /> E <br /> I C0920S[ON PRCTECTION <br /> U.:. tiSTED <br /> COMPATIBILITY WITH 100% ! i <br /> METHANOL <br /> 13. TANK(g) TO BE INSTALLED Po \\��� <br /> A. SteeL•C✓.ad With fiberglass reinforcau ptascic coatings, composites, r eWivaient mull- etatlie exterior <br /> coatfns or coverings, <br /> (1) Tested at the installation sits using an electric resisrance holiday detector. <br /> (2) vacu— applied to !ntersritiaL space. <br /> g. Fiberglass <br /> (1) :nstailattcn instructions require an air test and soap bubble test prior to insta(lation. <br /> (2) Vacuum[ applied to interstitial space- <br /> CS) Rydrostatic annular (primary tank pressure test), <br /> C. Yon-clad steel rank CSecrion 2055 (a) (2) (A)l <br /> (1) Cathodic protection provided for entire ,:ant, piping and comments !nuts, botts, washers, <br /> etc.). <br /> f (2) Field instal Led cathomic protection system designed and cetzified as adowate by a <br /> –� co"oSion speciatisr. <br /> (3) impressed crirrenr system to be inspected no less then every 60 days, <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.