Laserfiche WebLink
B-19-1999 2:22F'M FROM R 6 <br /> USP SYSTEM CRANING iNFORMAT!ON <br /> Three complete sats of plans Cinclude ianufacturerls spe-cifi=iwn sheets for propasec' equipment to be in:taited). <br /> 2, M ani drawn to wale in non-erasabte print. <br /> 3. Ptoe plan to shoe. LOGBtiOn of talks and att associated piping. <br /> G• str�kor platar ar droa tune-gaunt ed ho'[Z= prose=ta^s ittustrared festa att ac:essibte opening:i. <br /> Tank crws•sacticna! diagram. <br /> o. Detail 5f teak, asaccipted piptrg, excawation and cawr.. <br /> 7- Tank(g) and piping approved by a ratiorntty recognized irdependo"r testing organization. _Title 23, CSaprer in, <br /> Arriete a, Section 2631 (b) & 26353 <br /> 3, verificatio-i of pro.lsct co,paribitity with the tank(s), pious;, mcniterinc <br /> device(s), epoxy or sitiaane glues, etc. <br /> y_ Manufacturer's written i--ata;letion instructions for tank(s), piping, mcnitor ng devices, erc. <br /> i0. At the instaltation site, prior to irstaltation, a lightness rest shalt be per'crned on both primary (1°) and <br /> secondary (e) :antainwr systems before covering. CSeetion 2535 (a) (3) & (4)I <br /> 'rank integrity test -K;uired L4xn crmiplation of instaitation with tank in operating condition. 7esr results to be <br /> submitted directly tv PHS-CHD from the testing �-cppany or owner of fecitity. [Health S Safety Code, Division 20, <br /> .hapter 5.7, Section 25219\1 (h)3 <br /> 12, TALC CITIOiI `�� Z <br /> SANK 4 x # if <br /> 3 <br /> f WAciry �T I <br /> �j NAHUFACTURER <br /> 5 sITION �k <br /> l PRODUCT <br /> COR805iON PROTECTION f <br /> U.:. tiSTED <br /> FrPATIU LITY WITH 100» } <br /> AANOL f <br /> .3. TAiX(s) TO BE INSTALLED Po \\� � <br /> A. Sseel-eLad With fiberglass reinforced ptascic coatings, composites, r cWivalent rcn-mttattie exterior <br /> coatfngs or coveriT�p, <br /> (1) Tested at the instaliation sit: using ap eiectric resisrance holiday detector. <br /> (2) vacuum applied to 'ntersritiaL space. <br /> g_ Fiberglass <br /> (1) l=rittW*r instr,ictions require an air les: and scam bui?b.e test prior ro ins:attatiore. <br /> (2) vacuum app(iesd to interstitiat space. <br /> (3) aydrosratic annutar (primary lank .pressure test). <br /> C. dor-clad sraert tank tSection 2535 (a) (2) (A)3 <br /> _ (1) cathodic protection provided for entire sank, piping 3rd c=pone,:ts !nuts, baits, washers, <br /> etc.). <br /> (2) f'e•td installed carhoCie protection systems designed and Get-,i`ietd as adequate oY a <br /> corrasion sp-Ciatist. <br /> (3) !mpressad c:irrenr systems to be inspected w Less -hero every 60 days. <br /> 5 <br />