Laserfiche WebLink
o—i.-W-1 X71--Ia e- C4r1'i rrtui,i r- <br /> i <br /> 19. Piping (cross-sectiormt diagram, including r_oneeetians to tank and dispensers). <br /> (A) Vint and tank river primary containment System tquippad with ❑verfiLL prevention system that: <br /> /0� Restricts delivery of flow to tank (Section. 2635 (b) (Z) (9) ar (C)I, or <br /> XProvide positive shat Of of ftow to the tank at me more than 45 X [Section 26.55 (b)(2)(C)], or <br /> (8) vapor recovery piping Cesignk at it cannot contain Liquid phase product, or <br /> Suction piping (betcw gre(je piping operates at less than avw5pheric pressure) (Section 21,536 (a) (3)] <br /> Stoped so contents of the pipe will drain back into the storage tank if the suction is <br /> released. <br /> -- No valves or installed below grade- <br /> Inspection m=nod provided to daoortstrate comptiance with section 2.636 (a) (3). <br /> iorrvdible underground pip ng prorected against core Won (Section x636 (b)). <br /> (E) Underyrcurd primary pipir5 will meet att of the foltowinc requirements <br /> XPrimary piping in contact with hazardous substance under normat o atiext conditions shall be. <br /> !nsralted inside a secondary conrairxnent system in Che form of: seconcary pipe___vautt or <br /> Lined trench to be sipped co a collection sump at the low point of the piping- <br /> ` ` Primary piping and secondary containment systems O LL be !nstatted in accordance with industry <br /> code of practice and voluntary consensus standards.. <br /> Lined trench usevS as secondary containment <br /> Material coa-,atible with Che substamee stared- <br /> Covered arra csoabte of Supporting sny expected vehicular traffic. <br /> (F) underground piping with secondacy :ontainaent wilt at equipped and Monitor-ad as fatit*rs: <br /> ✓� Secondary containment wilt be equipped with a continuous monitoring system connected to an audible <br /> aid v(;uat alarm systam. <br /> Automatic Line le k detectors will be instatled paw ssurized piping <br /> Manufaeturtr: LM MICKar Model: ! . .G <br /> Annual monitoring wilt be conducted on the pressurizers piping with 3e^_ondary containment. <br /> XAnnual line tightness ^est wilt not be required if the continuous monitor shuts down the pwap and <br /> sctivates the alern system when a release is detected and wiien the Conti-uouus monitoring system <br /> fails or is disconnected. <br /> 20. Stat. water Resources Control Board "Fatuity (A)" and "Tank Permit (3)" appLioativn forms :ubwmitted. <br /> 21. Plan review and operating permit fits paid. / <br /> Z2, What is the approximate depth to ground water: ��n O D Y\ <br /> (incluse source of information - borahole :ogs, monitoring well. data, water <br /> studies, etc.) <br /> Total ntaaber of ranks an site after instaltarion: <br /> Z4. County/City Fire District and auilding Department notified. <br /> Z5, ` In the event contamination is observed, confirmed or suspected as a rbsult of a teexing UST system it is your <br /> responsibility Cin accordance with (CCR) Title 73, Division 3, Chapter ib, Article ii, Correctike Action <br /> Recuir tsem+ <br /> J as an owner or operator to submit a workplan to PMS-END Site Mitigation Unit prior to initiating any <br /> asses or ediation activities. For further assistance contact the S!te. Mirigation Unit at (209,) 469-34110, <br /> The awn o razor least acknowledge dais responsibili y for workplan tutmittat ay signature and tate 'stow. <br /> vame Titte �� ._ t"rAelQgp!'- late a <br /> �OHOITi0N5 4r APP*O%'At 'T <br />