My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999 - 2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
6100
>
2300 - Underground Storage Tank Program
>
PR0231630
>
COMPLIANCE INFO_1999 - 2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
3/21/2019 1:29:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999 - 2000
RECORD_ID
PR0231630
PE
2361
FACILITY_ID
FA0003630
FACILITY_NAME
ARCO STATION #595*
STREET_NUMBER
6100
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08704034
CURRENT_STATUS
02
SITE_LOCATION
6100 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment <br /> (Tank/Piping Removal) <br /> ON-SITE WORK PLAN <br /> FOR TANK/PIPING REMOVAL AND EXCAVATION <br /> Removal of Flammable Vapors and Removal of Tanks <br /> Removal of flammable vapors and removal of tanks will be performed in accordance with the <br /> requirements of Local Regulatory Agencies, The following are general guide lines. <br /> A review of available codes, standards, and recommended procedures produces the following <br /> consensus: <br /> A. All possible sources of ignition must be kept from impacting the tank or the area in <br /> which flammable vapors may reside during excavation or after removal. <br /> B. Drain and flush all piping into tank. Flammable or combustible free standing liquid <br /> production stock will be removed from the tank prior to removal. Avoid spilling <br /> product on the ground during disconnection of the tank from its associated lines. <br /> C. _ Vent lines should not be sealed and should be cut last. Keep all sources of ignition <br /> away from vent lines as well as tanks. <br /> D. Once all liquid has been removed from the tank, any tank with flammable vapors in <br /> excess of 10% of the LEL or 5% oxygen will be purged with dry ice (CO). Thirty <br /> pounds of dry ice per 1,000 gallons of tank capacity is added to render the tank <br /> inert. All piping except the vent pipe should be disconnected. <br /> Emergency Services <br /> The address and telephone number dd ihonlocal <br /> the t telephone ambulance mber of the fire departm emergency tlrescue room <br /> should be prominently posted. In , <br /> unit should be posted. <br /> General information regarding emergency services may be found on front page. <br />
The URL can be used to link to this page
Your browser does not support the video tag.