My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1999 - 2000
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
6100
>
2300 - Underground Storage Tank Program
>
PR0231630
>
COMPLIANCE INFO_1999 - 2000
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:51:12 PM
Creation date
3/21/2019 1:29:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999 - 2000
RECORD_ID
PR0231630
PE
2361
FACILITY_ID
FA0003630
FACILITY_NAME
ARCO STATION #595*
STREET_NUMBER
6100
Direction
N
STREET_NAME
STATE ROUTE 99
City
STOCKTON
Zip
95212
APN
08704034
CURRENT_STATUS
02
SITE_LOCATION
6100 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B. Fire and Explosion <br /> The presence of volatile liquids and vapors at this site presents the potential for fire or explosion <br /> during the excavation. The following precautions will be taken during the project to prevent fire <br /> or explosion: <br /> 1. There will be NO SMOKING within a 50 foot radius from the <br /> source of any vapors. <br /> 2. The atmosphere at the site will be continually monitored for the <br /> presence and concentration of flammable vapors and measurements <br /> will be documented in writing. <br /> 3. Two 10 A-20 B:C fire extinguishers will be maintained on site <br /> within 50 feet of the line of travel of the on-ground person <br /> designated as fire watch at all times. <br /> 4. During refueling of vehicles and heavy equipment, the engines of <br /> the equipment will be required to be off. There must be metal to <br /> metal contact between the refueling equipment and vehiclefheavy <br /> equipment being refueled. No combustion sources will be allowed <br /> with 25 feet of refueling operations. <br /> PERSONAL PROTECTIVE EQUIPMENT <br /> Level D PPE will be required on site at all times. The following table will guide upgrades from <br /> this level of protection: <br /> Consistent-Sustained <br /> Breathing Zone <br /> PID Reading Level of Protection <br /> <10 ppm Level D <br /> 10 - 100 ppm Level D + half-mask air purifying <br /> respirator <br /> 50 - 500 ppm Level D + full-face air purifying <br /> respirator <br /> >500 ppm Level D + SCBA <br /> Descriptions of the different levels of protection are found in Appendix A. <br />
The URL can be used to link to this page
Your browser does not support the video tag.