Laserfiche WebLink
SWRCB,January 2002 Page of <br /> 4. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested _ <br /> Test Method Developed By: Spill Bucket Manufacturer Industry Standard ; Professional Engineer <br /> Other(Spec) — <br /> Test Method Used: Pressure Vacuum (-`Hydrostatic--- <br /> Other(Specify) - <br /> Test Equipment Used: /S C,/4 L Equipment Resolution: <br /> Spill Box# Spill Boz# Spill Box# Spill Box# <br /> Bucket Diameter; <br /> Bucket Depth: S <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> test: 3 0 ^j (1 3 Z) ` <br /> Test Stan Time: /0 zlj� /(-} 4r- <br /> Initial Reading(R,): �'i z�� f 1 '+� �i �/,_ �'"2-- <br /> Test End Time; CrP– <br /> Final Reading(RF): L �'z <br /> Test Duration: .— <br /> Change in Reading(RF-Rj): c - c- T-. <br /> Pass/Fail Threshold or _ — --- <br /> Criteria: <br /> Test Result: aw W �ftw AM Pass Pail <br /> 5, -7 J� c l 01( <br /> Comments— (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> Og_ <br /> t <br />