Laserfiche WebLink
Mnnitokng System Certification <br /> -Site Address: X6100 N HWY 99 Date of Testin_glServici _ 12,ec <br /> D. Results of Testing/Servicing <br /> Software VersionInstalled: � _ Ul] <br /> Co to the following checklist: <br /> Ye No* Is the audible alarm operational? <br /> es 9 No* Is the visual alarm operational? <br /> M Y , No* Were all sensors visually inspected,functionally tested, and confirmed operational? <br /> es No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper operation? <br /> Yes - N * If alarms are relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> _ /A operational? <br /> WY esu No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> NIA monitoring system detects a leaf fails to operatedelectrically disconnecte 4 If yes: which sensors initiate <br /> positive shutdown? (Check allthatapply) Kg'S =/Trench Sensors- ispenserCont entSensors. <br /> Did you confirm positive shut-down due to leaks and sensor failureldis connection? '; es; No. <br /> Yes9For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> N <br /> - !A echanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fill point(s) and operating properly? If so, at what percent of tank capacity does the alarm trigger.? . . . .% <br /> Yes* o Was any monitoring equipment replaced? If yes,identify specific sensors,probes, or other equipment replaced <br /> and list the manufacturer name and model for all re lacement p arts in Section E,below. <br /> 0 Yes* ::, No Was liquid found inside any secondary containment systems designed as dry systems? (Check allflacta?;"qfy)� <br /> Product; M Water. If yes, describe causes in Section E,below. <br /> No* I Was monitoring system set-u reviewed to ensure proper settings? <br /> Yes I M No* I Is an monitoring equipment oerational permanufacturer's specifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments:j <br /> i <br /> f <br /> i <br /> i <br /> i <br /> r <br /> Page 2 of 3 03BI <br />