Laserfiche WebLink
10/19/2004 08:27 FAX 5629888165 S J WEAVER CONTRACTING 1@003 <br /> Page �`of <br /> a <br /> 1S. SPILL/OVERFILL CONTA VAUNT BOXES <br /> FTestMethod Developed By: ❑Spill Bucket Manufacturer X Industry Standard ❑Professional Engineer <br /> ❑Other(S,pec6) <br /> od Uses: -I Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Spee) <br /> Equipment Used.for Testing:InconTST-STS <br /> Spill Box#1 Spill Box#2 Spill Box#3 <br /> Bucket Diameter: is ^ �j� 1/G v o <br /> Bucket Depth: (� " <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: V AAIJ C— 4/b AJ C_ /la Al <br /> Test Start Time: <br /> Initial Reading(R): `f <br /> Test End Time: <br /> Test Duration: <br /> Change in Reading(RF-Rt): 0 tiC_- p d.✓ � <br /> Paw/Fail Threshold: Q 5:S <br /> Tel3t Restt: �S',S 0,,::GCgs' <br /> Comments—(include information on repairs made to facilitate a passing test and indicate whether a <br /> permit was obtained or the re airs) <br /> RC_U.S.T_COM December 2001 <br />