Laserfiche WebLink
SWRCB,January 2002 Page 6 of 21 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: ❑Piping Manufacturer ®Industry Standard ❑Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ®Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Analog Pressure Gauge Equipment Resolution: +/-0.25 <br /> Piping Run# T-1 Piping Run# T-2 Piping Run# T-3 Piping Run# T-4 <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith Smith <br /> Piping Diameter: 3" 3" 3" 3" <br /> Length of Piping Run: 80' 280' 360' 350' <br /> Product Stored: Diesel Diesel Diesel Unleaded <br /> Method and location of Trans sump To 19-20 STP-2 To 21 Thru 25 STP-3 To 26 Thru 30 STP-4 To Auto UDC's <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15 Minutes 15 Minutes 15 Minutes 15 Minutes <br /> startin test: <br /> Test Start Time: 11:15 Am 2:45 Pm 9:00 Am 4:00 Pm <br /> Initial Reading(RI): 5.00 Psi 5.00 Psi 5.00 Psi 5.00 Psi <br /> Test End Time: 12:15 Pm 3:45 Pm 10:00 Am 5:00 Pm <br /> Final Reading(RF): 5.00 Psi 5.00 Psi 5.00 Psi 5.00 Psi <br /> Test Duration: 1 Hour 1 Hour 1 Hour 1 Hour <br /> Change in Reading(RF-R,): 0.00 Psi 0.00 Psi 0.00 Psi 0.00 Psi <br /> Pass/Fail Threshold or 0.00 Psi 0.00 Psi 0.00 Psi 0.00 Psi <br /> Criteria: <br /> Test Result: ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail ® Pass ❑ Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />