Laserfiche WebLink
UNIFIED PROGRAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN- Pae 1 of 3 <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION 490-1. <br /> PLAN TYPE ® 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2. <br /> (Check one item only) ❑ 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): 490-2a, <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) 1' <br /> BUSINESS NAME(Same as Facility Name or DBA) <br /> ARCO 02186 <br /> BUSINESS SITE ADDRESS 3212 N CALIFORNIA 10t BUSINESS SITE CITY 104. <br /> STOCKTON <br /> U. EQUIPMENT.TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency specified <br /> by the equipment manufacturers'instructions,or annually,whichever is more frequent.Such work must be performed by qualified personnel.[23 CCR_12632,263°,2638,26411 <br /> MONITORING EQUIPMENT IS SERVICED ® 1.ANNUALLY ❑ 99.OTHER(Specify): 4903b. <br /> III: MONITORING LOCATIONS <br /> ® 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN ❑ 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED [23 CCR J2632,26341 <br /> 4904. <br /> IV. TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) �rc�happt <br /> " a" <br /> I.CONTINUOUS ELECTRONIC TANK MONrrORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) 490-5. <br /> WITH AUDIBLE AND VISUAL ALARMS.[23 CCR 12632,26341 <br /> SECONDARY CONTAINMENT IS: ® a.DRY ❑ b.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM 49". <br /> PANEL MANUFACTURER: Veeder Root 490-7. MODEL#: TLS-350R 490-8. <br /> _ LEAK SENSOR MANUFACTURER: Veeder Root 490-9 MODEL#(s): 794390-409 490-10. <br /> II 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).[23 CCR 126431 090-11 <br /> PANEL MANUFACTURER: 490.12. MODEL#: 490-13. <br /> IN-TANK PROBE MANUFACTURER: 49014 MODEL#(S): 490-15. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY/NIGHTLY ❑ c.WEEKLY 490-16. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): 490.17. <br /> _PROGRAMMED TESTS: _ ❑ a.0.1 g_p.h,__ C3 b.0.2 g.p.h_ -^❑ c.O_T_H_E_R(Specify): 4909109 to <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION 123 CCR 12646.11 490�20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)[23 CCR 126451 TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS <br /> _ ago-z2. <br /> C3 S. <br /> TANK INTEGRITY TESTING PER 123 CCR 12643.11 490-23. <br /> TEST FREQUENCY: a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specify): 490_z4. <br /> ----Q ❑ -------- ---- (-P fy)__ 490=2s._. <br /> -- 490-26. <br /> ❑ 99.OTHER(Specify): 490.27. <br /> V. PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) thateckaA <br /> ® 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE&VISUAL ALARMS. 490-28. <br /> [23 CCRSECONDARY CONTAINMENT IS: ® a.DRY [Ib.LIQUID FILLED ❑ c.PRESSURIZED ❑ d.UNDER VACUUM ago-z9. <br /> 1z6361 <br /> PANEL MANUFACTURER:Veeder Root 490-30' MODEL#: TLS-35OR 49031' <br /> LEAK SENSOR MANUFACTURER: Veeder Root 490-32. MODEL#(s): 794380-323 490.33, <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. ® a.YES ❑ b.NO 490-34. <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-15 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF 490-3157- <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED.,23 CCR126361 <br /> MLLD M_ANUFACTURER(S): 490.37. MODEL#(S): 490.38' <br /> ® 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0B P•h.LEAK TESTS.123 CCR126361 490-39. <br /> ELLD MANUFACTURER(S):Red Jacket 490-40' MODEL#(S): CPT 490-41. <br /> PROGRAMMED IN LINE LEAK TEST: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. 490-42. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490-43. <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. ® a.YES ❑ b.NO 490'4' <br /> ❑ 4.PIPE INTEGRITY TESTING. 490-45. <br /> _ -46 <br /> TEST FREQUENCY: _❑_a ANNUALLY ❑ b.EVERY 3 YEARS ❑ c.OTHER(Specify) 49047. <br /> ❑ 5.VISUAL PIPE MONITORING. 490-48. <br /> FREQUENCY: ❑ a.DAILY ❑ b.WEEKLY ❑ c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED. 49049. <br /> -__-_Allowcd for moeeorma of unbumd cmergewy amnitor fuel piping only per HSC 125281.5(6)(3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA.[23 CCR 12636(.x3)1 490-50.- <br /> 0 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM. -- 490-51, <br /> -- -- --- -------------- --- 49 <br /> ❑ 99.OTHER(Specify) 490-53. <br /> Arco 02186,Belsbire Environments!Services Page I of 6 <br />