Laserfiche WebLink
FIFTI PRnf RAM r0NC01.MATF.TI F <br /> TANKS <br /> UNDERGROUND STORAGE TANKS- TANK PAGE 2 <br /> Page 2 of 2_ <br /> VL PIPING CONSTRUCTION(Check all that apply) <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SYSTEM TYPE ®1.PRESSURE ❑2.SUCTION ❑3.GRAVITY 458. ❑ I.PRESSURE ❑2.SUCTION [13.GRAVITY 459. <br /> CONSTRUCTION/ ❑1.SINGLE WALL [13.LINED TRENCH ❑99.OTHER 460- ❑ 1.SINGLE WALL ❑95.UNKNOWN 462 <br /> MANUFACTURER <br /> ®2.DOUBLE WALL ❑95.UNKNOWN ❑2.DOUBLE WALL ❑99.OTHER <br /> MANUFACTURER A.O.Smith <br /> 461. 1 MANUFACTURER 463. <br /> ❑1.BARE STEEL ®6.FRP COMPATIBLE W/100%METHANOL ❑1.BARE STEEL ❑6.FRP COMPATIBLE W/100%METHANOL <br /> ❑2.STAINLESS STEEL ❑7.GALVANIZED STEEL ❑2.STAINLESS STEEL ❑7.GALVANIZED STEEL <br /> ❑3.PLASTIC COMPATIBLE WITH CONTENTS ❑95.UNKNOWN ❑3.PLASTIC COMPATIBLE W/CONTENTS ❑8.FLEXIBLE(HDPE) ❑99.OTHER <br /> ❑4.FIBERGLASS ❑8.FLEXIBLE(HDPE) [199.OTHER ❑4.FIBERGLASS ❑9.CATHODIC PROTECTION <br /> ❑5.STEEL W/COATING [19.CATHODIC PROTECTION 464. ❑5.STEEL W/COATING ❑95.UNKNOWN 465 <br /> VII.PIPING LEAK DETECTION(Check all that apply)(A description of the monitoring program shall be submitted to the local agency.) <br /> UNDERGROUND PIPING ABOVEGROUND PIPING <br /> SINGLE WALL PIPING 466. SINGLE WALL PIPING 467 <br /> PRESSURIZED PIPING(Check all that apply): PRESSURIZED PIPING(Check all that apply): <br /> ❑1. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP ❑1. ELECTRONIC LINE LEAK DETECTOR 3.0 GPH TEST WITH AUTO PUMP <br /> SHUT-OFF FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION SHUT OFF FOR LEAK,SYSTEM FAILURE,AND SYSTEM DISCONNECTION <br /> +AUDIBLE AND VISUAL ALARMS. +AUDIBLE AND VISUAL ALARMS. <br /> ❑2. MONTHLY 0.2 GPH TEST [12. MONTHLY 0.2 GPH TEST <br /> [33. ANNUAL INTEGRITY TEST(0.1 GPH) ❑3. ANNUAL INTEGRITY TEST(0.1 GPH) <br /> ❑4. DAILY VISUAL CHECK <br /> CONVENTIONAL SUCTION SYSTEMS CONVENTIONAL SUCTION SYSTEMS(Check all that apply) <br /> ❑5. DAILY VISUAL MONITORING OF PUMPING SYSTEM+TRIENNIAL PIPING [15. DAILY VISUAL MONITORING OF PIPING AND PUMPING SYSTEM <br /> INTEGRITY TEST(0.1 GPH) <br /> SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): [16. TRIENNIAL INTEGRITY TEST(0.1 GPH) <br /> [17. SELF MONITORING SAFE SUCTION SYSTEMS(NO VALVES IN BELOW GROUND PIPING): <br /> GRAVITY FLOW [17. SELF MONITORING <br /> [39. BIENNIAL INTEGRITY TEST(0.1 GPH) GRAVITY FLOW(Check all that apply): <br /> [18. DAILY VISUAL MONITORING <br /> [19. BIENNIAL INTEGRITY TEST(0.1 GPH) <br /> SECONDARILY CONTAINED PIPING SECONDARILY CONTAINED PIPING <br /> PRESSURIZED PIPING(Check all that apply): PRESSURIZED PIPING(Check all that apply): <br /> 10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL 10. CONTINUOUS TURBINE SUMP SENSOR WITH AUDIBLE AND VISUAL <br /> ALARMS AND(Check one) ALARMS AND(Check one) <br /> ❑a. AUTO PUMP SHUT OFF WHEN A LEAK OCCURS ❑a.AUTO PUMP SHUT OFF WHEN A LEAK OCCURS <br /> ®b.AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM ❑b.AUTO PUMP SHUT OFF FOR LEAKS,SYSTEM FAILURE AND SYSTEM <br /> DISCONNECTION DISCONNECTION <br /> ❑c. NO AUTO PUMP SHUT OFF ❑c. NO AUTO PUMP SHUT OFF <br /> ®11. AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST)WITH FLOW SHUT ❑11. AUTOMATIC LEAK DETECTOR <br /> OFF OR RESTRICTION <br /> ❑12. ANNUAL INTEGRITY TEST(0.1 GPH) ❑12.ANNUAL INTEGRITY TEST(0.1 GPH) <br /> SUCTION/GRAVITY SYSTEM SUCTION/GRAVI'I'Y SYSTEM <br /> [113. CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS ❑13. CONTINUOUS SUMP SENSOR+AUDIBLE AND VISUAL ALARMS <br /> EMERGENCY GENERATORS ONLY(Check all that apply) EMERGENCY GENERATORS ONLY(Check all that apply) <br /> C:114. CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF ❑14.CONTINUOUS SUMP SENSOR WITHOUT AUTO PUMP SHUT OFF <br /> AUDIBLE AND VISUAL ALARMS AUDIBLE AND VISUAL ALARMS <br /> [115. AUTOMATIC LINE LEAK DETECTOR (3.0 GPH TEST) WITHOUT FLOW [115.AUTOMATIC LINE LEAK DETECTOR(3.0 GPH TEST) <br /> SHUT OFF OR RESTRICTION <br /> [116. ANNUAL INTEGRITY TEST(0.1 GPH) [116.ANNUAL INTEGRITY TEST(0.1 GPH) <br /> ❑17. DAILY VISUAL CHECK ❑17.DAILY VISUAL CHECK <br /> VUL DISPENSER CONTAINMENT <br /> DISPENSER CONTAINMENT 468. ❑1. FLOAT MECHANISM THAT SHUTS OFF SHEAR VALVE ❑4. DAILY VISUAL CHECK 469. <br /> DATE INSTALLED ❑2. CONTINUOUS DISPENSER PAN SENSOR+AUDIBLE AND VISUAL ALARMS ❑5. TRENCH/LINER MONITORING <br /> 07/1999 ®3. CONTINUOUS DISPENSER PAN SENSORITH AUTO SHUT OFF FOR ❑6. NONE <br /> DISPENSER+AUDIBLE AND VISUAL ALARMS <br /> UL OWNEWOPERATOR SIGNATURE <br /> I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> SIGNATURE OF OWNER/OPERATOR DATE:11/12/2003 470. <br /> NAME OF OWNER/OPERATOR(print): John SChettei TITLE OF OWNER/OPERATOR: Compliance Specialist 472. <br /> �P=enmit-Nurnber(Agency use only) 473 1 Permit Approved By(Agency use only) 474. 1 Permit Expiration Date(Agency use only) 475. <br />