Laserfiche WebLink
14. ASG C ST�kr T�Al L,�' <br /> Name of Supplier.Owner or Dealer Address No.and Street(s) City State Date of Test <br /> D� 15. TANK TO TEST 16. CAPACITY From <br /> Z ❑ Station Chart <br /> 7K 'n. 4 By most accurate 7 <br /> m y e_�r Nominal Capacity capacity chart available ❑ Tank Manufacturer's Chart <br /> cn Identity by position Gallons Gallons - - <br /> A V/V LCf�10vpCapacity? <br /> ❑ ❑ Company Engineering Data <br /> VI Is there doubt as[o True Capacity 7 <br /> i ❑ Charts supplied with petro jfiP <br /> hBrand and Grade See Section"DETERMINING TANK CAPACITY" ❑ Oth9r tAW ESTER <br /> 17. FILL-UP FOR TEST Stick Readings Total Gallons <br /> to'/A in. Gallons ea.Reading <br /> Stick Water Bottom }rte (/ <br /> before Fill-up l/— _ _ Inventory fUGG //�/✓/r 77 93 <br /> to'/a in. Gallons <br /> w�rE� ZSZ <br /> Fill up.STICK BEFORE AND AFTER EACH COMPARTMENT DROP OR EACH METERED DELIVERY QUANTITY Top O6�: �O <br /> rn -0 Tank Diameter U 6 Product in full tank(up to fill pipe) _ V <br /> Q' 00o <br /> C) 18. SPECIAL CONDITIONS AND PROCEDURES TO TEST THIS TANK o�5 * � �� VAPOR RECOVERY SYSTEM <br /> A i ,o o i3y G-k4v: S-7 b <br /> A --, n See manual sections applicable.Check below and record procedure in log(26). © Stage <br /> 0 <br /> o N 13 ❑ Water in tank ❑ High water table in tank excavation ❑ Line(s)being tested with L LILT Stage II <br /> ODOOf<TI <br /> 0 21. TEMPERATURENOLUME FACTOR (a)TO TEST THIS TANK <br /> N 19. TANK MEASUREMENTS FOR <br /> TSTT ASSEMBLY Is Today Warmer?I I Colder?I I _ F Product in Tank °F Fill-up Product on Truck F Expected Change( + or - ) <br /> I /� <br /> Bottom of tank to Grade*.. 1 3 I SS� 6 6 - 6 <br /> cp -- 22. Thermal-Sensor reading after circulation `F <br /> Add 30"for 4"L ................. digns Nearest <br /> z <br /> Add 24"for 3"L or air seal ....... 23. Digits per OF in range of expected change J. v <br /> Total tubing to assemble Approximate digits <br /> 20. EXTENSION HOSE SETTING 24' ----u�== x ' �OCS��y� _ kt, 66091 6 gallons <br /> total quantity in coefficient of expansion for volume change in this tank <br /> Tank top to grade*, '........L ­­ ' ' L''. full tank(16 or 17) involved product per°F 0/43 <br /> Extend hose on suction tube 6"or more <br /> below tank top .._ . .............................. -n 25. 4,66 08'i 6 ;4 6 - ,O1�t�Y 7��� <br /> This is <br /> volume change per`F(24) Digits per°F in test Volume change per digit. test <br /> 'it Fill pipe extends above grade,use top of fill. Range(23) Compute to 4 decimal places. factor(a) <br /> 26. 30. HYDROSTATIC 31. 34. 38.NET VOLUME 39. <br /> VOLUME MEASUREMENTS(V) TEMPERATURE COMPENSATION <br /> EACH READING ACCUMULATED <br /> CONTROL <br /> LOG OF TEST PROCEDURES PRESSURE RECORD TO NI GAL. USE FACTOR(a) CHANGES CHANGE <br /> 27. 28. 29. Standpipe Level 32. 35. 36. 37. Temperature At High Level record <br /> out Record details of settingU Product in Product <br /> in Inches Change Computation Adjustment TOW fed DefNcbee <br /> P Reading Graduate Replaced(-) <br /> and running test. (Use full No. Thermal Higher+ (c) x (a) Volume Minus <br /> Beginning level to Sensor Lower- Expansion + Expansion(+)or At Loi Level compute <br /> TIME length of line if needed.) of which Before After Product ReadingContraction(-) an <br /> (c) Contraction - Chant r Hour <br /> (2e hr l Reading Restored Reading Reading Recovered(+) ,#33(V)-N37(T) (NFPA criteria) <br /> I <br /> I <br />