Laserfiche WebLink
Invoice Date 5/11/87 ppdpp�@ qp <br /> BECKER INDUSTRIES, INC. J�-9 4T6 87 <br /> JOY NAME/LOCATION <br /> REMIT TO: P.O. BOX 5269 . NAPA, CALIFORNIA 94581 '` ;'� V, ARS X2186 <br /> 2501 OAK STREET . NAPA, CALIFORNIA . 707/255-9580 <br /> 3212 California <br /> My '"1 Stodcbon <br /> To <br /> ARM Phi PRODUCTS <br /> ' <br /> P. O. Box 5811 PURCHASE ORDER r 109116 <br /> �� <br /> San Mateo, CA 94403 Arrived at job site and began ren ixrg the vapor recovery loses <br /> TERMS: NET10DAYS at the dispensers and capping off the vapor linea. We then m- <br /> noved the 2" unions on the Regular bead and Super Uhlead vapor <br /> recovery lines at the tanks. We then installed air test gauges <br /> AST' and atter ted to pressurize the lines. We found that the limes <br /> 1 Skip loader 250.00 would not hold <br /> in- <br /> 1- 175 cfm ocopressor w/2 jars 150.00 stant1 . We �' all <br /> fittings <br /> and the gauge fell e o <br /> 2 2"Y30 Y so�aP'e'd t.iY�gs but could not see or <br /> gals. nipples @ 5.68 11.36 hear any signs on problems. We then revorvnected all lines and <br /> 1 2"xclose gJly " 3.91 hoses. Then we dug out the vent lines swing joints and repiped <br /> them. We then cleaned up the debris fr❑m the vent line swing <br /> joint area and placed barricades around the trenctm. <br /> MAY Ij t�u7 <br /> LABOR HOURS RATE AMOUNT TOTAL MATERIAL 415.27 <br /> fin* <br /> Ilk 38.5C 442 75 TOTAL LABOR 1259.25 <br /> Ilk 35.5C 408125 MILES• <br /> Richard 11k 35.5C 408125 <br /> *FCFJ A81 RATE <br /> WORN ORDERED eY DATE COMPLETED <br /> TAX 24.92 <br /> SIGNATURE 11 I 11=1 L7.y . %q! <br /> TERMS CASH 2%par month service charge on overdue accounts. PAY•ITHIS AMOUNT♦ 1699. 44 <br />