My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986 - 1998
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
2300 - Underground Storage Tank Program
>
PR0231035
>
COMPLIANCE INFO_1986 - 1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2019 4:50:34 PM
Creation date
3/25/2019 9:10:58 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 1998
RECORD_ID
PR0231035
PE
2361
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
01
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
281
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> Invoice Date 5/22/87 pG7VY Do �(;[ qq,C' <br /> BECKER INDUSTRIES, INCIII � 9R DATE°`4�24 KT <br /> "S NAMMOCAT*N <br /> REMIT TO: P.O. BOX 5269 • NAPA, CALIFORNIA 94581 . AIM #2186 <br /> 2501 OAK STREET . NAPA, CALIFORNIA .707/255-9580 <br /> 3212 California <br /> TO ARM PE7Pj0L_W PROCIUM COMMY .: <br /> • Invoice Date 5/22/87 o5swoGL qOo�-- I]V/� <br /> BECKER INDUSTRIES INC. GNU=BER— ��aw�23 O <br /> J00 NAME/LOCAMN <br /> REMIT TO: P.O. BOX 5269 • NAPA, CALIFORNIA 94581 ARM #2196 <br /> 2501 OAK STREET • NAPA, CALIFORNIA • 707/255-9580 <br /> 4212 r-Aliftmia St- <br /> TO ARM PEM PRC7. Cn4PA <br /> PURCHASE ORDER I 109116 <br /> r04t <br /> On this day all debris was hauled from the station. It was <br /> TERMS: NET 10 DAYS loa3ed up and hauled amy to a dump at no d=W. A190 on <br /> this day the perimeter of bath tank holes Mere saw cut and <br /> ",Amit asphalt was broken out with Jackhammers. <br /> 1 Front end loader 250.00 <br /> 1 Dump truck 250.00 <br /> 1 concrete saw 75.00 <br /> 2 Dump fees No cbzrgE <br /> 1 180 cfm ompress w/2 hammers 150.00 _ <br /> 'lg7a- 0 �18�- i1 � Std, JUN 8 1987 <br /> LABOR HOURS RATE AMOUNT TOTAL MATERIAL 725 00 <br /> t Richard 8 35.50 284. TOTAL LABOR 568 00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.