Laserfiche WebLink
6 . TRAINING <br /> In addition to the training covering subjects mentioned in Sections 3 and 4 above, training <br /> needed for the operation of the tank system and monitoring equipment incivdes: <br /> How to: <br /> Take tads level measurements <br /> Read dispenser meters <br /> Inspect equipment <br /> Recognize warning signs: dispenser hesitations. meter spins and odors <br /> • ManuaBy close dispenser impact valve <br /> Replace dispenser raters <br /> Shut down the system with and location of : ARCOmatic switch, electrical panel <br /> breakers, and emergency shut off switch <br /> Test the electronic monitor <br /> 7 . <br /> Written records of all monitoring, testing. and maintenance performed shall be maintained <br /> on-she or off-she at a readily avaltable location for a period of at least 5 years. These <br /> records must be made available, upon request within 36 tours, to the local agency or the <br /> Board. <br />