Laserfiche WebLink
CONTINGENCY PLANS <br /> Contingency Plans: Summarize below. <br /> If free product or obvious subsurface contamination is noted,the boring will be discontinued. <br /> Site Health and Safety Plan Approvals <br /> Prepared By: William E.Motzer,Ph.D.,RG. Date: June 6, 1996 <br /> L <br /> Signature: <br /> SHSC Signature: Date: <br /> HSM Signature: <br /> rDate: <br /> L _ <br /> L.� <br /> L <br /> kr <br /> Page 12 of 32 <br /> j <br />