My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2000 - 2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CALIFORNIA
>
3212
>
2300 - Underground Storage Tank Program
>
PR0231035
>
COMPLIANCE INFO 2000 - 2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2024 2:39:12 PM
Creation date
3/26/2019 2:45:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2000 - 2006
RECORD_ID
PR0231035
PE
2361
FACILITY_ID
FA0006773
FACILITY_NAME
ARCO 02186
STREET_NUMBER
3212
Direction
N
STREET_NAME
CALIFORNIA
STREET_TYPE
ST
City
STOCKTON
Zip
95204
APN
12532001
CURRENT_STATUS
01
SITE_LOCATION
3212 N CALIFORNIA ST
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
This manual contains procedures for the installation or replacement of the Veeder-Root Position -Sensitive Pan/Sump <br />Sensor. This manual assumes all preliminary site preparation has been completed, and that field wiring from the <br />console to the pan/sump junction box is in place. <br />Following sensor installation, you will need to setup the console to monitor the sensor. <br />Contractor Certification Requirements <br />Veeder-Root requires the following minimum training certifications for contractors who will install and setup the <br />equipment discussed in this manual: <br />Level 1 Contractors holding valid Level 1 Certification are approved to perform wiring and conduit routing, <br />equipment mounting, probe and sensor installation, tank and line preparation, and line leak detector installation. <br />Level 213 Contractors holding valid Level 2 or 3 Certifications are approved to perform installation checkout, <br />startup, programming and operations training, troubleshooting and servicing for all Veeder-Root Tank Monitoring <br />Systems, including Line Leak Detection and associated accessories. <br />Warranty Registrations may only be submitted by selected Distributors. <br />Related Manuals <br />57601-S-879 TIS-3XX Site Prep and Instahation Manual <br />576013-623 TLS-3XX System Setup Manual <br />Safety Precautions <br />The following safety symbols are used throughout this manual to alert you to important safety hazards and <br />precautions. <br />,O v Explosive <br />Flammable <br />Fuels and their vapors are <br />extremely explosive if ignited. <br />Fuels and their vapors are <br />extremely flammable. <br />Turn Power Off <br />Electricity <br />G High voltage exists in, and is sup- <br />plied to, the device. A potential <br />shock hazard exists. <br />Live power to a device creates a <br />potential shock hazard. Turn Off <br />power to the device and associ <br />ated accessories when servicing <br />the unit. <br />Wear Eye Protection <br />Fuel spray from residual pres- <br />sure in the lines can cause seri- <br />ous eye injuries. Always wear <br />eye protection. <br />Careless or improper handling of <br />materials can result in bodily <br />injury. <br />® Gloves <br />Wear gloves to protect hands <br />from irritation or injury. <br />
The URL can be used to link to this page
Your browser does not support the video tag.