Laserfiche WebLink
3. Piping Leak Detection Monitoring Equipment <br />Monitoring Method Manufacturer <br />Model <br />I Monitoring Frequency <br />© Sump leak sensors connected to <br />❑ Mechanical float in dispenser <br />continuous monitoring system <br />Veeder Root <br />794380-323 <br />Specify type: <br />® Electronic leak sensor in dispenser <br />Continuous <br />❑ Discriminating <br />containment: <br />Veeder Root <br />794380-323 <br />® Non -discriminating <br />❑ Discriminating <br />❑ Mechanical line leak detectors with <br />® Non -discriminating <br />programmed leak threshold of three <br />❑ Daily <br />gallons per hour <br />❑ Other: <br />❑ No under -dispenser containment <br />® Electronic line leak detectors with <br />Red Jacket <br />CPT <br />programmed leak threshold of: <br />Every pumping cycle <br />❑ 0.1 gph ❑0.2 gph ®3 gph <br />❑ Line integrity testing by: <br />❑ Electronic line leak detector is <br />equipped to conduct line tightness <br />❑ Annually <br />testing <br />❑ Other: <br />❑ Third party testing <br />® Not required <br />❑ Other (Specify): <br />4_ DiGnenser Leak Detection Monitoring Eauipment <br />Monitoring Method <br />Manufacturer <br />Model <br />Monitoring Frequency <br />❑ Mechanical float in dispenser <br />containment <br />® Electronic leak sensor in dispenser <br />containment: <br />Veeder Root <br />794380-323 <br />Continuous <br />❑ Discriminating <br />® Non -discriminating <br />❑ Daily <br />❑ Visual inspection <br />❑ Other: <br />❑ No under -dispenser containment <br />❑ Other (specify): <br />5. Positive Snutaown L;a aoinues <br />❑ System does not have positive shutdown capabilities <br />❑ Individual dispenser shutdown will occur whenever release is sensed in under -dispenser containment <br />® Automatic pump shut off will occur whenever: <br />® Release is sensed in turbine sump <br />® Release is sensed in primary piping <br />® Release is sensed at dispenser <br />® Monitoring system is disconnected or fails in any way (fail safe) <br />❑ Other (specify): <br />6. Secondary Containment Testin <br />❑ Secondary containment is not tested <br />® In the State of California, secondary containment systems installed on or after January 1, 2001, shall be tested upon installation, <br />six months after installation, and every 36 months thereafter. Secondary containment systems installed prior to January 1, 2001, <br />shall be tested by January 1 2003 and every 36 months thereafter. <br />7 Annual Equipment Certitication/ I esting <br />® Annually <br />❑ Other (specify): <br />2 <br />